Particulars | Details |
---|---|
Title |
Mtps I Bm Unit I Boiler Pressure Parts Aoh 2025 Dismantling Cleaning And Rectification Of Defective Seal Trough Seal Plates Ss Woven Wire Mesh Providing Patch Plate
|
Description |
Mtps I Bm Unit I Boiler Pressure Parts Aoh 2025 Dismantling Cleaning And Rectification Of Defective Seal Trough Seal Plates Ss Woven Wire Mesh Providing Patch Plate
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_555704_1 |
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT.29/ 2025-26 |
Tender Fee | 0 |
EMD | 3100 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=663761 |
Start Date | May 08, 2025 23:30 |
End Date |
22/05/2025 ( Expired 27 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i bm unit i aoh 2025 26 flue gas duct a and b sides patch up works and other repair works between aph out let to esp inlet
Mtps i bm unit i aoh 2025 26 flue gas duct a and b sides patch up works and other repair works between aph out let to esp inlet
Read moreMtps i bm unit i aoh 2025 26 fg duct a and b sides renewal of deflector plates renewal of duct supports renewal of guard plates over the expansion joints etc
Mtps i bm unit i aoh 2025 26 fg duct a and b sides renewal of deflector plates renewal of duct supports renewal of guard plates over the expansion joints etc
Read moreMtps i tm unit i overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit i aoh 2025 26
Mtps i tm unit i overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit i aoh 2025 26
Read moreMtps i bm unit i boiler pressure parts aoh 2025 disposal of ash from pent house eco hopper deflection slope rear arch room and boiler roof area strengthening of eco hopper supports with new pipes and allied works
Mtps i bm unit i boiler pressure parts aoh 2025 disposal of ash from pent house eco hopper deflection slope rear arch room and boiler roof area strengthening of eco hopper supports with new pipes and allied works
Read moreMtps i bm aoh 2025 26 unit i complete overhaul of aph a and b sides and other related works
Mtps i bm aoh 2025 26 unit i complete overhaul of aph a and b sides and other related works
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreMtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Read moreMtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Mtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Read moreof your Industry type