Tender Details
Particulars | Details |
---|---|
Title |
B.T. Renewal To Wadadha Deshpur Road Vr 86 Km 0/000 To 3/000 And Cd Work At Ch 0/600 Protection Wall At Ch 1/400 And Drain Km 2/300 To 3/600 Ta.Armori
|
Description |
B.T. Renewal To Wadadha Deshpur Road Vr 86 Km 0/000 To 3/000 And Cd Work At Ch 0/600 Protection Wall At Ch 1/400 And Drain Km 2/300 To 3/600 Ta.Armori
|
Organisation | RDD-CEO-GADCHIROLI | State Govt. and UT |
Tender Id | 2025_GADCH_1146255_2 |
Reference Number |
Tender B-1/10/2024-25 |
Tender Fee | 1500 |
EMD | 40956 |
Tender Value | |
Place | Armori |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1995684 |
Start Date | February 06, 2025 16:30 |
End Date |
20/02/2025 ( Expired 59 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read morePerformance based maintenance contract (pbmc) estimate from km. 59/000 to 59/921 , 0/000 to 1/600 (temple link) of nh- 316 badadanda, puri and from km. 59/921 to 90/200 (puri-konark link) and from km. 0/000 to 28/500 (puri-satapada link) in odisha
Performance based maintenance contract (pbmc) estimate from km. 59/000 to 59/921 , 0/000 to 1/600 (temple link) of nh- 316 badadanda, puri and from km. 59/921 to 90/200 (puri-konark link) and from km. 0/000 to 28/500 (puri-satapada link) in odisha
Read moreConstruction of bt road, cc road, paved shoulder, drain and protection wall form model road to zone 2 hilly area chhindwara
Construction of bt road, cc road, paved shoulder, drain and protection wall form model road to zone 2 hilly area chhindwara
Read moreConstruction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Construction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Read moreEstimate for repair p/r/l il tiles and road gully street no 1 main road to hansraj, st no 2 lal chand, st no 3 ruldu ram tak, st no 4 buta ram tak w.no 11 at mc banur
Estimate for repair p/r/l il tiles and road gully street no 1 main road to hansraj, st no 2 lal chand, st no 3 ruldu ram tak, st no 4 buta ram tak w.no 11 at mc banur
Read moreWidening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Read moreNhidcl/roimphal/mr/yfc/2024/km 0 to km 16.9
Maintenance of existing road section from km 0 to km 16.90 of yaingangpokpi to finch corner road section of nh202 in the state of manipur on item rate and work order basis to be carried out at the risk and cost of the epc contractor 8th call
Read moreFlood damage repairs for the year 2024-25 1.construction of protective wall at km 81/10 of nh-181,2. construction of protective wall at km .88/6 of nh-181 and 3. construction of protective wall at km.92/2 of nh-181 under flood damage repairs (coimba
Flood damage repairs for the year 2024-25 1.construction of protective wall at km 81/10 of nh-181,2. construction of protective wall at km .88/6 of nh-181 and 3. construction of protective wall at km.92/2 of nh-181 under flood damage repairs (coimba
Read moreConstruction of h/l bridges 15.56 m long over khui khera drain x-ing fazilka to malout road (mdr-40) at rd 37200 including its approaches, road di and protection work in district fazilka (under head 5054 rb-10)
Construction of h/l bridges 15.56 m long over khui khera drain x-ing fazilka to malout road (mdr-40) at rd 37200 including its approaches, road di and protection work in district fazilka (under head 5054 rb-10)
Read moreof your Industry type