Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Tender Announcement: Cleaning Services For Belt Conveyor Routes 🚦 Eastern Coalfields Limited (Ecil), A Public Sector Undertaking, Is Seeking Bids For The Cleaning Of Debris, Including Coal, Along The Belt Conveyor Routes At Nakrakonda Kumardihi B Colliery. 🪨 📅 Bid Submission Deadline: May 24, 2024, 6:00 Pm The Scope Of Work Includes The Cleaning Of The Belt Conveyor Routes From Tb1 To Gb2, And Along The Minus 10 L Of Rviib Seam, For A Duration Of Two Months As Part Of The Cm Project. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 11,600. Keywords: Cleaning Services, Coal Debris, Belt Conveyor, Eastern Coalfields Limited, Colliery, Tender, Bid Submission, Emd| Particulars | Details |
|---|---|
| Title |
Cleaning Of Debris Including Coal Along The Belt Conveyor Route (Tb1 Gb1 Gb2, Belt Along Minus 10 L Of Rviib Seam) For The Period Of Two (2) Month Of Cm Project Under Nakrakonda Kumardihi B Colliery.
|
| Description |
Cleaning Of Debris Including Coal Along The Belt Conveyor Route (Tb1 Gb1 Gb2, Belt Along Minus 10 L Of Rviib Seam) For The Period Of Two (2) Month Of Cm Project Under Nakrakonda Kumardihi B Colliery.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_308112_1 |
|
Reference Number |
ECL/GM/BA/E TENDER/24-25/Min/14 Dt 14.05.2024 |
| Tender Fee | 0 |
| EMD | 11600 |
| Tender Value | - |
| Place | Nakrakonda Kumardihi B Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319260 |
| Start Date | May 14, 2024 23:30 |
| End Date |
Expired
24/05/2024
Expired 873 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Debris cleaning for intallation the belt conveyor at minus 4d to minus 7d along 2l in rvi seam of cm project under nakrakonda kumardihi b colliery
Debris cleaning for intallation the belt conveyor at minus 4d to minus 7d along 2l in rvi seam of cm project under nakrakonda kumardihi b colliery
Read moreConstruction of 10 nos man holes at drifts from rviic to rviib seam and roof bolting supports at minus 8l to minus 6l along minus 6d in rviic seam of cm project under nakrakonda kumardihi b colliery
Construction of 10 nos man holes at drifts from rviic to rviib seam and roof bolting supports at minus 8l to minus 6l along minus 6d in rviic seam of cm project under nakrakonda kumardihi b colliery
Read moreReplacement of drive drum driven drum gear and motor after dismantling at tb1 belt at nakrakonda kumardihi b colliery under bankola area
Replacement of drive drum driven drum gear and motor after dismantling at tb1 belt at nakrakonda kumardihi b colliery under bankola area
Read moreReplacement of drive drum, driven drum gear and motor after dismantling at tb1 tendem belt at nakrakonda kumardihi b colliery under bankola area
Replacement of drive drum, driven drum gear and motor after dismantling at tb1 tendem belt at nakrakonda kumardihi b colliery under bankola area
Read moreDebris cleaning at travelling route( minus 3d to minus 10 along minus 8l of panel 3)in rvi seam of cm project under nakrakonda kumardihi b colliery
Debris cleaning at travelling route( minus 3d to minus 10 along minus 8l of panel 3)in rvi seam of cm project under nakrakonda kumardihi b colliery
Read moreDebris cleaning at rviic seam (minus 14l to minus 18l along minus 5d, and minus5d to 0d along minus14l) for installation of the belt conveyor of panel 4 and panel8 of cm project under nakrakonda kumardihi b colliery (retender)
Debris cleaning at rviic seam (minus 14l to minus 18l along minus 5d, and minus5d to 0d along minus14l) for installation of the belt conveyor of panel 4 and panel8 of cm project under nakrakonda kumardihi b colliery (retender)
Read moreInstallation and commissioning of conveyor belt in rviib seam for lhcm4 package at nakrakonda kumardihi b colliery under bankola area.(03 nos.)
Installation and commissioning of conveyor belt in rviib seam for lhcm4 package at nakrakonda kumardihi b colliery under bankola area.(03 nos.)
Read moreMaking fabrication transportation of foot overbridge drive of conveyor belt in rviib seam etc at nakrakonda kumardihi b colliery under bankoila area.
Making fabrication transportation of foot overbridge drive of conveyor belt in rviib seam etc at nakrakonda kumardihi b colliery under bankoila area.
Read moreDebris cleaning at travelling route( minus 3d to minus 10 along minus 8l of panel 3)in rvi seam of cm project under nakrakonda kumardihi b colliery (retender)
Debris cleaning at travelling route( minus 3d to minus 10 along minus 8l of panel 3)in rvi seam of cm project under nakrakonda kumardihi b colliery (retender)
Read moreCleaning of debris including coal along the belt conveyor route (tb 1 gb 1 belt along10l or rviib seam belt along 0l of rv seam) for the period of 2(two) month of cm project of nakrakonda kumardihi b colliery
Cleaning of debris including coal along the belt conveyor route (tb 1 gb 1 belt along10l or rviib seam belt along 0l of rv seam) for the period of 2(two) month of cm project of nakrakonda kumardihi b colliery
Read moreof your Industry type