Tender Details

Particulars Details
Title
Rehabilitation Work Of Ganganadi Bridge Located On Moradabad Gavan Bulandshahr Road (Including Anupshahr Dibai Part, Sh 148)
Description
Rehabilitation Work Of Ganganadi Bridge Located On Moradabad Gavan Bulandshahr Road (Including Anupshahr Dibai Part, Sh 148)
Organisation Cheif Engineer Meerut Zone PWD Meerut | State Govt. and UT
Tender Id 2025_CEMRT_1032305_1
Reference
Number
2897/96M/E-Tender/BSR Circle/25-26 Dt. 03.04.25
Tender Fee 2714
EMD 11.28 Lakh
Tender Value
Place Bulandshahr
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1867763
Start Date April 26, 2025 14:30
End Date

02/05/2025 ( Expired 17 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Inviting rate for all kind of lt line extentin and shifting of lines transformers and other electrical work on mpuadd issr 02.08.2021 sor all item

Inviting rate for all kind of lt line extentin and shifting of lines transformers and other electrical work on mpuadd issr 02.08.2021 sor all item

Read more
Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).

Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).

Read more
Construction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction

Construction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise