Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Link Road From Sarahar To Gawal Km 0/000 To 2/060 Under Mnp Sub Head Wideing Of Road From Existing Width To 5/7 Mtr Wide Road In Km. 0/000 To 0/785 And Formation Cutting 5/7 Mtr Wide In Km. 0/785 To 1/195
|
Description |
Construction Of Link Road From Sarahar To Gawal Km 0/000 To 2/060 Under Mnp Sub Head Wideing Of Road From Existing Width To 5/7 Mtr Wide Road In Km. 0/000 To 0/785 And Formation Cutting 5/7 Mtr Wide In Km. 0/785 To 1/195
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_102687_2 |
Reference Number |
No PW OSDN 2024 17969-70 dt 15.03.2025 |
Tender Fee | 5000 |
EMD | 88000 |
Tender Value | |
Place | Nirmand |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=150845 |
Start Date | March 21, 2025 21:35 |
End Date |
27/03/2025 ( Expired 69 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read moreShort term maintenance to kanaka durga flyover from km. 0/000( 269/900) to km. 5/122 (275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh
Short term maintenance to kanaka durga lyover from km.0/000( 269/900) to km.5/122(275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh
Read moreUnder state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Under state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Read moreOne time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read moreAnnual maintenance of anantapuramu bypass to kanaganapalli road from km.0/0 to 21/2 for the year 2025-26 in anantapuramu district
Annual maintenance of anantapuramu bypass to kanaganapalli road from km.0/0 to 21/2 for the year 2025-26 in anantapuramu district
Read moreMaintenance of rehabilitation and upgradation of existing carriageway to 2 lane 4 lane with paved shoulder configuration from wadigodri to dhangripimpri km 0 000 to km 30 390 section of nh753h on epc mode in the state of maharashtra package1 risk and
Maintenance of rehabilitation and upgradation of existing carriageway to 2 lane 4 lane with paved shoulder configuration from wadigodri to dhangripimpri km 0 000 to km 30 390 section of nh753h on epc mode in the state of maharashtra package1 risk and
Read moreMaintenance of rehabilitation and upgradation of existing highway to 2 lane 4 lane with paved shoulder configuration from dhangarpimpri to jalna and ambad chowk to mantha chowk km 30 390 to km 50 264 and 0 000 to 5 243 two lane with paved shoulder
Maintenance of rehabilitation and upgradation of existing highway to 2 lane 4 lane with paved shoulder configuration from dhangarpimpri to jalna and ambad chowk to mantha chowk km 30 390 to km 50 264 and 0 000 to 5 243 two lane with paved shoulder
Read moreGeneral sabarimala work 2024 25 upgradation with bm bc 7.500km generalimprovements to nariyampara kalthotty vellilamkandom kizhakkemattukkatta chembalam road at 0 000 to 5 500 and nariyampara melekanchiyar road ch.0 000 to 2 000
The following items were proposed in the estimate.dismantling the existing wearing coat ,clearing light jungles etc. earth work excavation for widening and berm removal etc. construction of sub base ,base and shoulder includes gsb for widening ,wmm
Read moreof your Industry type