Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Deep Tube Well With Drain Soak Well At Majhidih Near Mandir
|
| Description |
Construction Of Deep Tube Well With Drain Soak Well At Majhidih Near Mandir
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_ZPHD_530810_12 |
|
Reference Number |
4(e)/EO/JLD-II/2023-24 |
| Tender Fee | 700 |
| EMD | 4700 |
| Tender Value | |
| Place | Office of the Executive Officer |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | November 21, 2023 22:30 |
| End Date |
Expired
29/11/2023
Expired 967 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of deep tube well with drain and soak well at majhidih near mandir
Construction of deep tube well with drain and soak well at majhidih near mandir
Read moreConstruction of deep tube well with drain soak well at majhidih village
Construction of deep tube well with drain soak well at majhidih village
Read moreConstruction of deep tube well with drain soak well at pogro village
Construction of deep tube well with drain soak well at pogro village
Read moreConstruction of deep tube well with drain soak well at barametyala village
Construction of deep tube well with drain soak well at barametyala village
Read moreConstruction of deep tube well with drain soak well at pogro village
Construction of deep tube well with drain soak well at pogro village
Read moreConstruction of deep tube well with drain soak well at barametyala village
Construction of deep tube well with drain soak well at barametyala village
Read moreof your Industry type