Construction Of Railway Over Bridge On Road Latur Sh 211 To Pimpalgaon Para Bhogari Kallamb Shiradhon Bhuisamudra Road, Sh 236, At Km. 102/380, Tq. And District Latur And Survey, Alignment And Dpr Work)
Description
Construction Of Railway Over Bridge On Road Latur Sh 211 To Pimpalgaon Para Bhogari Kallamb Shiradhon Bhuisamudra Road, Sh 236, At Km. 102/380, Tq. And District Latur And Survey, Alignment And Dpr Work)
Organisation Government of Maharashtra
Tender Id 2023_PWR_918377_2
Reference
Number
Notice No. B-1 LTR- 09 For 2023-24 E-Tender
Tender Fee 590
EMD 15000
Tender Value
Place EE PWD LATUR
Link https://mahatenders.gov.in
Start Date June 23, 2023 00:25
End Date

30/06/2023 ( Expired 689 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).

Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).

Read more
Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore

Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore

Read more
Construction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.

Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road

- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road

Read more
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s