Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Fabrication Fitting And Fixing Of Sleeper, Round Dolna, Sitting Bench , Shed With Sitting Arrangement, Repairing Of Boundary Wall ,Pathway At Kalikinkar Park Under Srirampur Gp
|
Description |
Construction Of Fabrication Fitting And Fixing Of Sleeper, Round Dolna, Sitting Bench , Shed With Sitting Arrangement, Repairing Of Boundary Wall ,Pathway At Kalikinkar Park Under Srirampur Gp
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id | 2025_ZPHD_839754_1 |
Reference Number |
173/SGP/5th.SFC/2024-25 |
Tender Fee | 700 |
EMD | 7000 |
Tender Value | |
Place | SRIRAMPUR |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1872582 |
Start Date | April 29, 2025 00:25 |
End Date |
05/05/2025 ( Expired 40 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreProvn of 04 x toilets in 28/4 camp, addition/alteration of road, culvert at depot entry gate, provn of hard standing at risepta, pathway at 9 cib, brick wall and re-fixing of rolling shutter in building no p-13 (rice shed) at mil stn yol
Provn of 04 x toilets in 28/4 camp, addition/alteration of road, culvert at depot entry gate, provn of hard standing at risepta, pathway at 9 cib, brick wall and re-fixing of rolling shutter in building no p-13 (rice shed) at mil stn yol
Read moreZone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.
Zone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.
Read moreWork of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Work of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Read moreConstruction of boundary wall, pathway, gajibo fountain and other necessary work in the nilkanth colony garden under ward no. 07 zone no.01.
Construction of boundary wall, pathway, gajibo fountain and other necessary work in the nilkanth colony garden under ward no. 07 zone no.01.
Read moreConstruction of double gate and wall at deepak padda dwar of 281 med regt and em work at lpg storage shed under ge (west) pathankot
Construction of double gate and wall at deepak padda dwar of 281 med regt and em work at lpg storage shed under ge (west) pathankot
Read moreConstruction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreHeight raising of plant boundary wall near guard pond (approx 150 meter long) and supplying, fitting, fixing of rbt concertina fencing on boundary wall at different locations, stps.
Height raising of plant boundary wall near guard pond (approx 150 meter long) and supplying, fitting, fixing of rbt concertina fencing on boundary wall at different locations, stps.
Read moreConstruction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Construction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Read moreof your Industry type