Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kerb Stone Painting, Footpath Repairing Etc At Gc Prayagraj
|
| Description |
Kerb Stone Painting, Footpath Repairing And Unserviceable Street Light
Replacement For Anniversary Parade 2024 At Gc Crpf Prayagraj
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2024_CRPF_789480_1 |
|
Reference Number |
GC PRRJ/23-24/MW/Wks(NIT-8) |
| Tender Fee | 0 |
| EMD | 32650 |
| Tender Value | - |
| Place | Works Dte |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | January 09, 2024 23:30 |
| End Date |
Expired
16/01/2024
Expired 982 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreUpgradation/repairing of kerb stone and footpath at i.a. pilakhni, distt. saharanpur
Upgradation/repairing of kerb stone and footpath at i.a. pilakhni, distt. saharanpur
Read moreRepair replacement of kerb stone berm painting etc at ge faridkot mil stn
Repair replacement of kerb stone berm painting etc at ge faridkot mil stn
Read moreRepairing of divider painting pedistrain crossing thrmoplastic paint sign board kerb stone and painting etc from swargate to katraj road
Repairing of divider painting pedistrain crossing thrmoplastic paint sign board kerb stone and painting etc from swargate to katraj road
Read morePurchase of paint material for kerb stone painting, etc in midhani plant.
Purchase of paint material for kerb stone painting, etc in midhani plant.
Read moreMaint repair of kerb stone berm painting and footpath under ge faridkot mil stn
Maint repair of kerb stone berm painting and footpath under ge faridkot mil stn
Read moreRepair and painting of kerb stone at various roads
Repair and painting of kerb stone at various roads
Read moreof your Industry type