Tender Details

About Tender

🏗️ Invitation For Bids: Independent Engineer Services For Nh 8 Project 🛣️👷‍♂️ The National Highways And Infrastructure Development Corporation Limited (Nhidcl), Under The Aegis Of The Central Government's Ministry/Department, Invites Bids From Qualified Independent Engineers For The Supervision Of The Construction Of The 4 Lane Karanj Sutarkandi Section In Assam, Under The Hybrid Annuity Mode. 📅 Bid Submission Deadline: 01/05/2024, 3:00 Pm Tender Fee: Inr 5900 Emd: Inr 200000 This Project Is A Critical Component Of The National Highway Development And Aims To Enhance Connectivity And Infrastructure In The State Of Assam. Interested Bidders Should Possess The Necessary Qualifications And Experience In Highway Construction Supervision. Comprehensive Bids Should Include Detailed Project Plans, Expertise, And Financial Bids. Keywords: Nhidcl, Independent Engineer, Construction Supervision, National Highways, Infrastructure Development, Hybrid Annuity Mode, Assam, Bid, Tender, Emd, Road Projects
Particulars Details
Title
Nhidcl/Assam/Nh 8/Ham/Ie/S C/Pkg Vii/2024
Description
Independent Engineer Services For Supervision Of Construction Of 4 Lane Of Karanj Sutarkandi Section In The State Of Assam On Hybrid Annuity Mode. Package Vii
Organisation National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department
Tender Id 2024_NHIDC_801134_1
Reference
Number
NHIDCL/Assam/NH-8/HAM/IE/S C/Pkg-VII/2024
Tender Fee 5900
EMD 2 Lakh
Tender Value
Place Assam
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=842131
Start Date April 10, 2024 17:30
End Date

10/06/2024 ( Expired 369 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Read more
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Read more
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham

Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham

Read more
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham

Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham

Read more
Supply and construction of combined toilet bathroom (8/1) s and c

Supply and construction of combined toilet bathroom (8/1) s and c

Read more

Ie services for construction to 2-lane with paved shoulder of tura bypass between existing km 57.500 of nh-127b (design chainage km 0.000) and km 108.750 of nh-217 (design chainage km 29.030) (length 29.030km) on hybrid annuity mode

Read more
G e n e r a l - e m e r g e n c y m o n s o o n preparedness-side protection to kaitheri thodu in mangattidam panchayath.-urgent side protection work to damaged left bank of kaitheri thodu at d/s side of vcb in ward 8 of mangattidam grama panchayath,

Urgent side protection work to damaged left bank of&amp#x0d kaitheri thodu at d/s side of vcb in ward 8 of&amp#x0d mangattidam grama panchayath, mattannur&amp#x0d constituency, kannur district

Read more
Nhidcl/ro-agt/w/t/s -k(pkg-v)/323-part(1)

Special repair work on nh-208 from km 75.700 to km 101.30 (total &#x0d length 25.600 km) at various sections srirampur to khowai section &#x0d at the risk and cost of epc contractor in the state of tripura in the fy &#x0d 2025-26 on item rate basis work or

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise