Tender Details
Particulars | Details |
---|---|
Title |
Constructing 2.2 Km 11k V Line Using 99 Sqmm Covered Conductor For Interlinking Parakkadavu And Vishnumangalam Feeder In Electrical Section, Parakkadavu.
|
Description |
Constructing 2.2 Km 11k V Line Using 99 Sqmm Covered Conductor For Interlinking Parakkadavu And Vishnumangalam Feeder In Electrical Section, Parakkadavu Under Electrical Circle,Vadakara.
|
Organisation | Kerala State Electricity Board | State Govt. and UT |
Tender Id | 2025_KSEB_745266_1 |
Reference Number |
PMU/VDK/e-Tender/14/2024-25 dtd. 03-03-2025 |
Tender Fee | 2124 |
EMD | 22400 |
Tender Value | |
Place | Manjappalli to Kallunira. |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1202202 |
Start Date | March 05, 2025 16:30 |
End Date |
13/03/2025 ( Expired 88 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreIndependent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreof your Industry type