🏭 Procurement Opportunity: Reinforcement Steel For Ntpc Kahalgaon Stps 🏭 Bharat Heavy Electricals Limited, On Behalf Of The Central Government's Ministry/Department, Is Seeking Bids For The Supply Of 1050 Metric Tonnes Of Reinforcement Steel For The Flue Gas Desulfurization (Fgd) Package Of The Ntpc Kahalgaon Super Thermal Power Station (Stps) Stage I And Ii, With A Total Capacity Of 4x210 Mw Plus 3x500 Mw, Located In Bihar. 📅 Bid Submission Deadline: May 20, 2024, 9:00 Am Interested Bidders Are Invited To Submit Detailed Bids, Including Technical Specifications, Pricing, And Delivery Schedules, In Accordance With The Project Requirements And Standards. Keywords: Reinforcement Steel, Ntpc Kahalgaon Stps, Fgd Package, Bharat Heavy Electricals Limited, Central Government, Power Sector Procurement, Tender, Bid Submission
Particulars Details
Title
Supply Of 1050 Mt Reinforcement Steel For Fgd Package Of Ntpc Kahalgaon Stps Stage I And Ii (4x210 Mw Plus 3x500 Mw), Bihar
Description
Supply Of 1050 Mt Reinforcement Steel For Fgd&#X0d Package Of Ntpc Kahalgaon Stps Stage I And Ii (4x210 Mw Plus 3x500 Mw), Bihar&#X0d
Organisation Bharat Heavy Electricals Limited | Central Govt. Ministry/Department
Tender Id 2024_BHEL_755886_1
Reference
Number
GEM/2024/B/4926047
Tender Fee 0
EMD 0
Tender Value
Place NTPC KAHALGAON STPS STAGE I and II (4x210 MW plus
Link https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1059306
Start Date May 10, 2024 00:15
End Date

20/05/2024 ( Expired 393 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project

Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k, india

Read more
Lot i package civil works of dulhasti stage ii hep, kishtwar, jammu and kashmir

Lot i package civil works of dulhasti stage ii hep, kishtwar, jammu and kashmir

Read more
Lot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india

Read more
All risk comprehensive package mega risk policy including terrorism and third party liability policy for jkspdc 900 mw baglihar power station (stage i and ii), chanderkote, district ramban, jammu and kashmir

All risk comprehensive package mega risk policy including terrorism and third party liability policy for jkspdc 900 mw baglihar power station (stage i and ii), chanderkote, district ramban, jammu and kashmir

Read more
Structural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)

Structural rehabilitation work and improvement of reservoir, dam, outlet and &amp#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &amp#x0d meghalaya under drip-ii (package-viii)

Read more
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
Biennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps

Biennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps

Read more
Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh

Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh

Read more
Supply of bcw emergency make up valve with actuator and drain valve with actuator for unit i and ii

Supply of bcw emergency make up valve with actuator and drain valve with actuator for unit i and ii

Read more
Engaging associate for balance of system package for development of design, engineering, supply, erection, testing and commissioning including 03yrs comprehensive operation and maintenance of 100 mw(ac) solar power project at gsecls re park at khavda

Engaging associate for balance of system package for development of design, engineering, supply, erection, testing and commissioning including 03yrs comprehensive operation and maintenance of 100 mw(ac) solar power project at gsecls re park at khavda

Read more
Click Here to Download Dockets
of your Industry type