Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏙️ Invitation For Bids: Wastewater Treatment Project 💧 The Kolkata Metropolitan Development Authority (Kmda), Under The State Government And Union Territories, Is Seeking Bids From Experienced Contractors For The Comprehensive Design, Construction, Commissioning, Trial Run, And Operation And Maintenance Of A Wastewater Treatment Plant With A Capacity Of 46.36 Mld. The Project Scope Includes A 3 Month Trial Run And 60 Months Of Operation And Maintenance, Along With The Supply Of Coagulants And Disinfectants As Required. This Initiative Is Part Of The Atal Mission For Rejuvenation And Urban Transformation (Amrut) 2.0. 📅 Bid Submission Deadline: June 28, 2024, 1:00 Pm A Bid Security Of Inr 10,00,000 Is Required. Interested Bidders Should Submit Detailed Proposals, Including Technical And Financial Bids, To Meet The Project's Stringent Requirements And Contribute To Sustainable Urban Development. Keywords: Wastewater Treatment, Kmda, Kolkata, Amrut 2.0, Design, Construction, Operation And Maintenance, Coagulants, Disinfectants, Bid Submission, Tender, State Govt. And UtParticulars | Details |
---|---|
Title |
24/Se(ec)/W And S/Kmda Of 2023 2024
|
Description |
Design, Construction, Commissioning, Trial Run (3 Months) And Operation And Maintenance For 60 Months Including Supply Of Coagulants And Disinfectants As Required For 46.36 Mld Capacity..... Scheme Within Panihati Municipal Area Under Amrut 2.0.
|
Organisation | KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY | State Govt. and UT |
Tender Id | 2024_KMDA_678127_1 |
Reference Number |
24/SE(EC)/W and S/KMDA of 2023-2024 |
Tender Fee | 0 |
EMD | 10 Lakh |
Tender Value | |
Place | KOLKATA |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1475114 |
Start Date | March 02, 2024 00:25 |
End Date |
28/06/2024 ( Expired 376 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Master sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.
Master sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.
Read moreDesign, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room
Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at amargarh, district malerkotla, punjab under amrut 2.0 scheme.
Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at amargarh, district malerkotla, punjab under amrut 2.0 scheme.
Read moreOperation and maintenance of sewage treatment plant of 6.50 mld capacity (mbbr technology) at budhlada for 12 months period 01.04.2025 to 31.03.2026
Operation and maintenance of sewage treatment plant of 6.50 mld capacity (mbbr technology) at budhlada for 12 months period 01.04.2025 to 31.03.2026
Read moreAugmentation of water supply scheme udhampur town under amrut 2.0 incl. operation and maintenance for 05 years scope of work as per sbd
Augmentation of water supply scheme udhampur town under amrut 2.0 incl. operation and maintenance for 05 years scope of work as per sbd
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Read moreSupply, delivery and fixing of stationary desilting machines for removing silt from drainage pumping stations with 3 months maintenance in circle 2 area (15fcg amrut 2.0 incentive grant).3rd call
Supply, delivery and fixing of stationary desilting machines for removing silt from drainage pumping stations with 3 months maintenance in circle 2 area (15fcg amrut 2.0 incentive grant).3rd call
Read moreAugmentation and rehabilitation of water supply scheme canal water based water supply project for const. of 10 mld wtp and other related works including 5 years operation and maintenance at mukerian distt. hsp. punjab part-2 under amrut 2.0 scheme
Augmentation and rehabilitation of water supply scheme canal water based water supply project for const. of 10 mld wtp and other related works including 5 years operation and maintenance at mukerian distt. hsp. punjab part-2 under amrut 2.0 scheme
Read moreConstruction of rcc elevated over head reservoir (intze type) of capacity 350 cum at zone- 5, ward -9 and house service connection at zone -3 within buniadpur municipality under proposed water supply scheme of amrut 2.0
Construction of rcc elevated over head reservoir (intze type) of capacity 350 cum at zone- 5, ward -9 and house service connection at zone -3 within buniadpur municipality under proposed water supply scheme of amrut 2.0
Read moreDesign, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years
Design, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years
Read moreof your Industry type