Tender Details

About Tender

🛣️ Invitation For Bids: Operation And Maintenance Of Nh46 Bhopal Biaora Section 🛣️ The National Highways Authority Of India (Nhai), Through Its Regional Office In Bhopal, Is Seeking Bids For The Operation And Maintenance Of The Four Lane Bhopal Biaora Section From Lalghati Square Km 315.725 To Mubarakpur Bhopal Bypass Km 324.000, Which Falls Under Package I Of Nh46 In Madhya Pradesh. 📅 Bid Submission Deadline: July 31, 2024, 11:00 Am Tender Fee: Inr 25,000 Earnest Money Deposit (Emd): Inr 486,600 Interested Bidders Must Possess The Requisite Experience And Qualifications To Manage The Operation And Maintenance Of This Critical National Highway Stretch. Proposals Should Encompass Detailed Plans For Traffic Management, Safety, And Maintenance Activities, Along With Financial Bids And Compliance With The Tender Documents. Keywords: Operation And Maintenance, National Highways Authority Of India, Nh46, Bhopal Biaora Section, Infrastructure, Public Sector Undertaking, Tender, Bid Submission, Emd, Tender Fee
Particulars Details
Title
Operation And Maintenance Of Four Lane With Paved Shoulder Bhopal Biaora Section From Lalghati Square Km 315.725 To Mubarakpur Bhopal Bypass Km 324.000 Pkg I Of Nh46 In The State Of Mp
Description
Operation And Maintenance Of Four Lane With Paved Shoulder Bhopal Biaora Section From Lalghati Square Km 315.725 To Mubarakpur Bhopal Bypass Km 324.000 Pkg I Of Nh46 In The State Of Mp
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_198704_1
Reference
Number
NHAI/RO-BPL/BPL-BIA/NH-46/2024
Tender Fee 25000
EMD 4.87 Lakh
Tender Value
Place NHAI RO Bhopal
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=217396
Start Date June 18, 2024 23:10
End Date

07/08/2024 ( Expired 284 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Read more
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)

Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Read more
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Read more
O and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.

O and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise