Tender Details
About Tender
๐ Procurement Opportunity: Replacement Of Ms Pipes And Rusted Gutters ๐ ๏ธ The Delhi Metro Rail Corporation Limited, Under The Aegis Of The Central Government, Has Announced A Procurement Bid For The Replacement Of Defunct Ms Pipes And Rusted Platform Drain Gutters From Janakpuri East To Nawada Station On Line 3 Section. ๐ ๐ Bid Submission Deadline: June 07, 2024, 2:00 Pm ๐ธ Tender Fee: Inr 23,600 ๐ฐ Earnest Money Deposit (Emd): Inr 350,350 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And Project Execution Timelines, For The Supply And Installation Of Upvc Pipes And Gi Drain Gutters. The Project Is Part Of The Ongoing Efforts To Enhance The Infrastructure And Safety Of The Delhi Metro Network. Keywords: Delhi Metro Rail Corporation, Ms Pipes, Upvc Pipe, Gi Drain Gutter, Infrastructure, Safety, Government Tender, Procurement, Construction, Metro Rail, New DelhiParticulars | Details |
---|---|
Title |
Replacement Of Defunct Ms Pipes And Rusted Platform Drain Gutter With Upvc Pipe And Gi Drain Gutter From Janakpuri East To Nawada Station In Line 3 Section
|
Description |
Replacement Of Defunct Ms Pipes And Rusted Platform Drain Gutter With Upvc Pipe And Gi Drain Gutter From Janakpuri East To Nawada Station In Line 3 Section
|
Organisation | Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department |
Tender Id | 2024_DMRC_803620_1 |
Reference Number |
OCW-1573 |
Tender Fee | 23600 |
EMD | 3.5 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=844695 |
Start Date | June 01, 2024 14:30 |
End Date |
07/06/2024 ( Expired 346 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreRehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreMaintenance work of jabalpur - hiran river section of nh-12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp-iii on epc mode on the risk and cost of the epc
Maintenance work of jabalpur - hiran river section of nh-12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp-iii on epc mode on the risk and cost of the epc
Read moreStrengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Read moreof your Industry type