Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Transformer Oil Nytro 10 X N Of Nynas Napthenics Pvt. Ltd Make For Siemens Make Emu Rake For Main Transformer.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106605999 |
Reference Number |
80242236A |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/032025/106605999/viewNitPdf_4864047.pdf |
Start Date | February 12, 2025 17:36 |
End Date |
05/03/2025 ( Expired 114 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of battery room behind main laboratory division basic science (size 8 x 10 sloping roof 2.5 /2.1 roof precoated puff sheet structure at icar-iihr, bengaluru
Construction of battery room behind main laboratory division basic science (size 8 x 10 sloping roof 2.5 /2.1 roof precoated puff sheet structure at icar-iihr, bengaluru
Read moreRate contract for complete repairing/rewinding of bhel make 100 kva transformer rectifier of esp system at 2x600 mw, sstpp,mppgcl,dongalia.
Rate contract for complete repairing/rewinding of bhel make 100 kva transformer rectifier of esp system at 2x600 mw, sstpp,mppgcl,dongalia.
Read moreSupply of spares suitable for 12kv 40ka 630 a siemens make vcb _ type 3af 1162 to retrofit the siemens make vcb panel to 6.6 kv alind make vcb panel_ floor mounted_8 items
Supply of spares suitable for 12kv 40ka 630 a siemens make vcb _ type 3af 1162 to retrofit the siemens make vcb panel to 6.6 kv alind make vcb panel_ floor mounted_8 items
Read moreEffecting pipeline upgradation to divert gas from seal oil traps of 10 k 105 in lpg plant and fire water line for running ia ig compressors for cooling purpose and mitigate the bottlenecking of higher mp flash gas pressure in gsu at ongc hazira plant
Effecting pipeline upgradation to divert gas from seal oil traps of 10 k 105 in lpg plant and fire water line for running ia ig compressors for cooling purpose and mitigate the bottlenecking of higher mp flash gas pressure in gsu at ongc hazira plant
Read moreProviding and fixing of material for repair work, oil filteration and oil top-up of 2 no. 315 kva transformer of 33 kv sub-station at man project, jeerabad distt. dhar (m.p.) (second call)
Providing and fixing of material for repair work, oil filteration and oil top-up of 2 no. 315 kva transformer of 33 kv sub-station at man project, jeerabad distt. dhar (m.p.)&#x0d (second call)&#x0d
Read morePartial rewinding of 2.5 mva, 33/ 3.3kv 3 phase mirzapur electricals make transformer sl.no. 39175 installed at main receiving sub-station for ug power supply of churcha east block of churcha mine (r.o).
Partial rewinding of 2.5 mva, 33/ 3.3kv 3 phase mirzapur electricals make transformer sl.no. 39175 installed at main receiving sub-station for ug power supply of churcha east block of churcha mine (r.o).
Read moreWork of replacement of defective oil level indicator (mog), air cell and other miscellaneous works of 40 mva transformer-ist (cgl make) at 132 kv sub-station jaspur under 220 kv oandm division, mahuakheraganj
Work of replacement of defective oil level indicator (mog), air cell and other miscellaneous works of 40 mva transformer-ist (cgl make) at 132 kv sub-station jaspur under 220 kv oandm division, mahuakheraganj
Read moreProcurement of antifriction metal conditioner (lubricant additive) for gear box oil of coal mill of unit no. 10 and 11 stps, sarni.
Procurement of antifriction metal conditioner (lubricant additive) for gear box oil of coal mill of unit no. 10 and 11 stps, sarni.
Read moreOverhauling cum oil leakage arresting of 132/33 kv 20 mva gece make power transformer-ii installed at 132/33 kv gss garhwa road.
Overhauling cum oil leakage arresting of 132/33 kv 20 mva gece make power transformer-ii installed at 132/33 kv gss garhwa road.
Read moreAmc of 140t khanudih inmotion rail weighbridge, block-ii area for a period of one year (make pragati instrumentation pvt ltd)
Amc of 140t khanudih inmotion rail weighbridge, block-ii area for a period of one year (make pragati instrumentation pvt ltd)
Read moreof your Industry type