Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Lhs Track Motor Repair Of Ck300, L And T 721 Hydraulic Shovel
|
Description |
Repairing Of Lhs Track Motor Repair Of Ck300, L And T 721 Hydraulic Shovel
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_332426_1 |
Reference Number |
BCCL/BII/EXC/REP/e-Tender/ 24-25 /198 Dt.13.03.25 |
Tender Fee | 0 |
EMD | 2489 |
Tender Value | |
Place | ABOCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344612 |
Start Date | March 13, 2025 20:30 |
End Date |
24/03/2025 ( Expired 29 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreJp/b862-102-pm-t-9500/1013 epc tender for pp upstream of powder section for pdh-pp plant with ethane and propane handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Epc tender for pp upstream of powder section for pdh-pp plant with ethane and propane handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreEngaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of imb between bp-168 to bp-175 (length - 74.70 km) including constr of approach rd
Engaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of imb between bp-168 to bp-175 (length - 74.70 km) including constr of approach rd
Read moreDesign and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Design and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Read moreEngaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of indo-myanmar border (imb) between bp-179 to bp-186
Engaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of indo-myanmar border (imb) between bp-179 to bp-186
Read moreRehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Read moreReplacement of filter media in slow sand filter bed with replacement of door of guard room
Replacement of filter media in the slow sand filter bed with replacement of door and of guard room, repairing of storage godown and fittings and face lifting etc. at lallmitti water treatment plant under beodnabad section.
Read moreJp/b957-500-ep-t-9801/1010 ethylene double wall storage tanks (dwst) package including all associated supply and works of bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)
Jp/b957-500-ep-t-9801/1010 ethylene double wall storage tanks (dwst) package including all associated supply and works of bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)
Read moreRepair and maintenance of pune solapur km 14 000 to km 40 000 and installation of streetlights km 40 000 km 150 050 section of nh 65 old nh 9 in the state of maharashtra
Repair and maintenance of pune solapur km 14 000 to km 40 000 and installation of streetlights km 40 000 km 150 050 section of nh 65 old nh 9 in the state of maharashtra
Read moreWork of motor pump repairing and water motor input and remove from tubewell at nagar parshad bagli
Work of motor pump repairing and water motor input and remove from tubewell at nagar parshad bagli
Read moreof your Industry type