Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Procurement Opportunity: Annual Maintenance Contract For Bottom Ash Handling Systems 🚫 The Durgapur Projects Limited, A State Government Undertaking, Invites Bids For An Annual Maintenance Contract (Amc) For The Dry Bottom Ash Handling Systems Of U 7 (300 Mw) And U 8 (250 Mw) Units, As Well As The Dpps And Economizer Hopper Ash Handling Systems Of U 7 / Dpps. The Contract Period Is For 2 Years With An Option To Extend For An Additional Year. 📅 Bid Submission Deadline: June 18, 2024, 4:00 Pm Earnest Money Deposit (Emd): Inr 4,35,800 Interested Bidders Must Submit Detailed Proposals, Including Maintenance Plans, Technical Capabilities, And Financial Bids, To The Office Of The Gm Power And Project Before The Deadline. Keywords: Annual Maintenance Contract, Bottom Ash Handling System, U 7, U 8, The Durgapur Projects Limited, State Govt. And Ut, Tender, Bid Submission, Emd| Particulars | Details |
|---|---|
| Title |
Annual Maintenance Contract For Dry Bottom Ash Handling System Of U 7(300 Mw) And U 8(250 Mw) / Dpps And Economizer Hopper Ash Handling System Of U 7 / Dpps For A Period Of 2(two) Year With A Provision Of Extension For Another One Year
|
| Description |
Annual Maintenance Contract For Dry Bottom Ash Handling System Of U 7(300 Mw) And U 8(250 Mw) / Dpps And Economizer Hopper Ash Handling System Of U 7 / Dpps For A Period Of 2(two) Year With A Provision Of Extension For Another One Year
|
| Organisation | THE DURGAPUR PROJECTS LIMITED | State Govt. and UT |
| Tender Id | 2024_DPL_689478_1 |
|
Reference Number |
WBDPL/PP/T/ 12012(11)/2/2024/AHP/462 |
| Tender Fee | 0 |
| EMD | 4.36 Lakh |
| Tender Value | - |
| Place | Office of the GM Power and Project |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1501769 |
| Start Date | June 08, 2024 15:30 |
| End Date |
Expired
25/06/2024
Expired 843 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of bottom ash and wet ash system spares for overhauling of u-1 and 2 at bktps.
Procurement of bottom ash and wet ash system spares for overhauling of u-1 and 2 at bktps.
Read moreTggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreSupply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Read moreProcurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Procurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Read moreRectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreRequirement of m/s fluidomat make fluid coupling sc-10 (scoop control) and its spares installed at ash slurry pump of bottom ash handling system unit 5 and 6, csctpp, chhabra for f. y. 2026-27
Requirement of m/s fluidomat make fluid coupling sc-10 (scoop control) and its spares installed at ash slurry pump of bottom ash handling system unit 5 and 6, csctpp, chhabra for f. y. 2026-27
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreAnnual maintenance contract for dry bottom ash handling system of u7(300mw) and u8(250mw) / dpps and economizer hopper ash handling system of u7 / dpps for a period of 2(two) year with a provision of extension for another one year
Annual maintenance contract for dry bottom ash handling system of u7(300mw) and u8(250mw) / dpps and economizer hopper ash handling system of u7 / dpps for a period of 2(two) year with a provision of extension for another one year
Read moreof your Industry type