Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tyre Wall,Tunnel,Zig Zag Balance,Crawling,Lime Stone White
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4655086 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 18, 2024 16:57 |
| End Date |
Expired
28/02/2024
Expired 958 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | ARC SOLUTIONS | - | 26-02-2024 10:34:35 | N/A | Qualified |
| 2 | DJ TRADER | - | 26-02-2024 10:49:13 | N/A | Qualified |
| 3 | MANSIRAT ENTERPRISES | - | 26-02-2024 09:19:34 | N/A | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | MANSIRAT ENTERPRISES | Item Categories : Tyre Wall,Tunnel,Zig Zag Balance,Crawling,Lime Stone White | 81200.00 | L1 |
| 2 | DJ TRADER | Item Categories : Tyre Wall,Tunnel,Zig Zag Balance,Crawling,Lime Stone White | 85000.00 | L2 |
| 3 | ARC SOLUTIONS | Item Categories : Tyre Wall,Tunnel,Zig Zag Balance,Crawling,Lime Stone White | 92000.00 | L3 |
Start point,restricted ldg,triple ldg zone,zig-zag path,l bend,rhombus,ae tunnel,bunker,fig 8,tent,dive trg a,elevated ldg,ring,inverted u,snake climb,multiple zig-zag path,3 boxes,wave,l bend 9 reverse,finish
Start point,restricted ldg,triple ldg zone,zig-zag path,l bend,rhombus,ae tunnel,bunker,fig 8,tent,dive trg a,elevated ldg,ring,inverted u,snake climb,multiple zig-zag path,3 boxes,wave,l bend 9 reverse,finish
Read morePeanut shape gym ball,tyre or tube swing,platform swing,disc swing,sensory swing,kids walking beam,tunnel tent for kids,occupational therapy mats,balance board,theraputty
Peanut shape gym ball,tyre or tube swing,platform swing,disc swing,sensory swing,kids walking beam,tunnel tent for kids,occupational therapy mats,balance board,theraputty
Read moreTender document for obtaining environment clearance in respect of lime stone quarry khrew pulwama
Tender document for obtaining environment clearance in respect of lime stone quarry khrew pulwama
Read moreCobble stone,prefabricated welcome gate,boundary fence,rcc u drain,granite flooring,prefabricated green tunnel,prefabricated arc bridge,prefabricated viewing deck
Cobble stone,prefabricated welcome gate,boundary fence,rcc u drain,granite flooring,prefabricated green tunnel,prefabricated arc bridge,prefabricated viewing deck
Read moreWhite washing and stone dusting along belt roadway, haulage/travelling roadways and return roadways from incline
White washing and stone dusting along belt roadway, haulage/travelling roadways and return roadways from incline mouth to proposed depillaring panels 23ls,16ls and 7ln in seam a of kurja ug mine hasdeo area
Read moreWhite washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.
White washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.
Read moreMaintenance work of ( surface dressing, jungle cleaning, drain cleaning and repairing, kerb stone repairing white washing, painting and other miscellaneous work) of 60m wide road between sector-36/37, sector-36/31/32 t-junction to 130m wide road holy
Maintenance work of ( surface dressing, jungle cleaning, drain cleaning and repairing, kerb stone repairing white washing, painting and other miscellaneous work) of 60m wide road between sector-36/37, sector-36/31/32 t-junction to 130m wide road holy
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type