Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔧 Procurement Notice: Compressor After Cooler Components 🔧 The Department Of Atomic Energy, Under The Purview Of The Prime Minister's Office, Is Seeking Bids For The Supply Of Critical Components For 70 K1/2 Air Compressors, Specifically: 📅 Bid Submission Deadline: April 03, 2024, 3:00 Pm Interested Bidders Are Required To Provide Detailed Quotations For The Following Items: Inter Cooler For 70 K1/2 Air Compressor After Cooler For 70 K1/2 Air Compressor Inter Cooler For 3 Hp Air Compressor Bidders Must Demonstrate Expertise In The Supply Of High Quality, Durable Components That Meet Stringent Industry Standards. Keywords: Inter Cooler, After Cooler, 70 K1/2 Air Compressor, 3 Hp Air Compressor, Department Of Atomic Energy, Pmo, Procurement, Compressor Components| Particulars | Details |
|---|---|
| Title |
Inter Cooler For 70 K1/2 Air Compressor,After Cooler For 70 K1/2 Air Compressor,Inter Cooler For 3
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2024/B/4618479 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 13, 2024 15:06 |
| End Date |
Expired
03/04/2024
Expired 921 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Procurement of ac compressor mounting bracket spares for d155a-6r at rgoc-2
Procurement of ac compressor mounting bracket spares for d155a-6r at rgoc-2
Read moreSupply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.
Supply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.
Read moreProviding inter connections at ward no.5 and 25 from amruth line to existing municipal water supply lines under municipal general funds of jagtial municipality
Providing inter connections at ward no.5 and 25 from amruth line to existing municipal water supply lines under municipal general funds of jagtial municipality
Read moreDesign, engineering, supply, installation, testing and commissioning of environmental telemonitoring system in under ground mines of sccl with 03 years comprehensive annual maintenance contract after 02 years comprehensive warranty.
Design, engineering, supply, installation, testing and commissioning of environmental telemonitoring system in under ground mines of sccl with 03 years comprehensive annual maintenance contract after 02 years comprehensive warranty.
Read moreSupply and installation of new lift (1 no) of 13 passenger capacity with g+5 stops and comprehensive annual maintenance for 5 years after defect liability period at maitrivihar commercial complex
Supply and installation of new lift (1 no) of 13 passenger capacity with g+5 stops and comprehensive annual maintenance for 5 years after defect liability period at maitrivihar commercial complex
Read moreConstruction of 1 ml elsr at padma sri hills to serve the water supply to padma sri hills and surrounding colonies under kismathpur section sd-i, o and m division xviii (after re-organisation pertains to bandlaguda jagir ward, rajendranagar circle, o and m dn -9 (varied staging).
Construction of 1 ml elsr at padma sri hills to serve the water supply to padma sri hills and surrounding colonies under kismathpur section sd-i, o and m division xviii (after re-organisation pertains to bandlaguda jagir ward, rajendranagar circle, o and m dn -9 (varied staging).
Read moreSupply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Supply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Read moreSupply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv swit
Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv switchyard of nagarjunasagar main power house, telangana
Read moreProviding,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of
Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Read moreof your Industry type