Tender Details

About Tender

🏭 Tender Announcement For Ttps Mech Ii Ahp Replacement 🏭 Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Replacement Of 150 Nb Ms Erw Heavy Duty Pipes For The Raw Water Pipeline From The Ash Slurry Pump House To The Electrostatic Precipitator (Esp) In Unit Iii Of The Ttps Facility. 📅 Bid Submission Deadline: July 19, 2024, 2:00 Pm The Tender Fee Is Non Refundable Inr 1100. Interested Bidders Must Provide Detailed Technical And Financial Bids, Including Compliance With The Project Specifications And Adherence To Safety And Quality Standards. Keywords: Tneb Limited, Ttps, Mech Ii Ahp, Replacement, Heavy Duty Pipe, Raw Water Pipeline, Electrostatic Precipitator, State Govt. And Ut, Tender, Bid Submission
Particulars Details
Title
Ttps Mech Ii Ahp Replacement Of 150 Nb Ms Erw Heavy Duty Pipe Of Various Length For Raw Water Pipe From Ash Slurry Pump House To Esp In Unit Iii
Description
Ttps Mech Ii Ahp Replacement Of 150 Nb Ms Erw Heavy Duty Pipe Of Various Length For Raw Water Pipe From Ash Slurry Pump House To Esp In Unit Iii
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_459973_1
Reference
Number
CE/TTPS/SE/M-II/No.321/2024-25
Tender Fee 0
EMD 1100
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546770
Start Date July 04, 2024 19:30
End Date

19/07/2024 ( Expired 299 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia

Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia

Read more
Ttps mech ii tm ii unit iv renewal of boiler feed pump cartridge assembly model fk 6d 30 in bfp 4b including alignment and allied works

Ttps mech ii tm ii unit iv renewal of boiler feed pump cartridge assembly model fk 6d 30 in bfp 4b including alignment and allied works

Read more
Ttps mech ii ahp unit iii pdfac system erection and commissioning of oil injected air cooled screw type single stage 160kw rotary air compressor with related accessories for unit iii pdfac system

Ttps mech ii ahp unit iii pdfac system erection and commissioning of oil injected air cooled screw type single stage 160kw rotary air compressor with related accessories for unit iii pdfac system

Read more
Biennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps

Biennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps

Read more
Procurement of different sizes of ms erw pipe for ash water line at ahp, stgi through approved capex 2025 26,sgtpp,wbpdcl

Procurement of different sizes of ms erw pipe for ash water line at ahp, stgi through approved capex 2025 26, sgtpp,wbpdcl

Read more
Ge/smb/t-10/2025-26 repair replacement to submersible pump centrifugal pump monoblock pump and connected allied works at water supply installations in zone i ii and iii under aor of ge samba

Repair replacement to submersible pump centrifugal pump monoblock pump and connected allied works at water supply installations in zone i ii and iii under aor of ge samba

Read more
Supply of 200nb ss316 gr spool piece for sea water jetting line from high pressure water pump to ash slurry sump of stage ii

Supply of 200nb ss316 gr spool piece for sea water jetting line from high pressure water pump to ash slurry sump of stage ii

Read more
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Read more
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Read more
Procurement of spares for new allenberry works make gear box (csa - 250) installed with ash slurry pump in ahp-ii 2x660 mw, stage-ii, sstpp, mppgcl, dongalia.

Procurement of spares for new allenberry works make gear box (csa - 250) installed with ash slurry pump in ahp-ii 2x660 mw, stage-ii, sstpp, mppgcl, dongalia.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise