Tender Details

Particulars Details
Title
General Mrvp Section 2/1 Survey And Demarcation Works To The Land On Both Sides Upstream And Downstream Of Proposed Rcb At Arunapuram In Pala Municipality General Civil Work
Description
General Mrvp Section 2/1 Survey And&Amp#X0d Demarcation Works To The Land On Both Sides&Amp#X0d Upstream And Downstream Of Proposed Rcb At&Amp#X0d Arunapuram In Pala Municipality General Civil&Amp#X0d Work
Organisation Irrigation Department | State Govt. and UT
Tender Id 2025_Irrig_724062_1
Reference
Number
IRR/PII/TR/4705/2024_3_1_1/1
Tender Fee 555
EMD 5924
Tender Value
Place Arunapuram-Pala
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1189935
Start Date February 20, 2025 15:30
End Date

01/03/2025 ( Expired 81 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Annual percentage rate contract on mes ssr 2020 for civil maintenance of doors, s , wire mesh glasses, shutter and including other connected works of f-1,f-2, f-3,f-4,f-5,f-6, f-7 and f-9 in filling area inside at ofk.

Annual percentage rate contract on mes ssr 2020 for civil maintenance of doors, s , wire mesh glasses, shutter and including other connected works of f-1,f-2, f-3,f-4,f-5,f-6, f-7 and f-9 in filling area inside at ofk.

Read more
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Work of covering the drain on both sides from state bank of india to delhi road in ward no. 19 and 29 in the municipal area khoda-makanpur with rcc slabs and cc chequered tiles.

Work of covering the drain on both sides from state bank of india to delhi road in ward no. 19 and 29 in the municipal area khoda-makanpur with rcc slabs and cc chequered tiles.

Read more
General rm 2024 25 rc 2 phase 1 under road section west eleri in kasaragod district 9 roads stretches for a length of 47.75km -general civil work general civil work

General rm 2024 25 rc 2 phase 1 under road section west eleri in kasaragod district 9 roads stretches for a length of 47.75km -general civil work general civil work

Read more
General-pwd complex(mini civil station annex)-building sub division,perinthalmanna- s.r works -urgent repairs and rennovation works to pwd buildings sub division and buildings section office, perinthalmanna in malappuram dt.-electrification-

General-pwd complex(mini civil station&amp#x0d annex)-building sub division,perinthalmanna-&amp#x0d s.r works -urgent repairs and rennovation&amp#x0d works to pwd buildings sub division and&amp#x0d buildings section office, perinthalmanna in&amp#x0d malappuram dt.-electrification

Read more
Others-hiring of 1 number of vehicle having cubic capacity 1000 to 1500 cc-on contract basis-dry lease without driver for the use of p. h. section, guruvayoor for six months or for 9500 km whichever comes first-general civil work

Others-hiring of 1 number of vehicle having&amp#x0d cubic capacity 1000 to 1500 cc-on contract&amp#x0d basis-dry lease without driver for the use of&amp#x0d p. h. section, guruvayoor for six months or for&amp#x0d 9500 km whichever comes first-general civil&amp#x0d work

Read more
Construction work of covered drain on both sides of phoolwali gali in ward maulviganj 1 from fatehpur barabanki road to baradari mosque/culvert.

Construction work of covered drain on both sides of phoolwali gali in ward maulviganj 1 from fatehpur barabanki road to baradari mosque/culvert.

Read more
General-running contract work 2025 - 2026-annual maintenance/repair and premonsoon works in various buildings under kuttippuram buildings section -general civil work-1

General-running contract work 2025 - 2026-annual maintenance/repair and premonsoon works in various buildings under kuttippuram buildings section -general civil work-1

Read more
General rectification kip lbmc rectification and leak arresting works to kunnumanal chittar moolakkayam, ayiranalloore and manalil aqueducts and main canal in between ch 1847 m and 10775 m general civil work

General rectification kip lbmc rectification and leak arresting works to kunnumanal chittar &amp#x0d moolakkayam, ayiranalloore and manalil aqueducts and main canal in between ch 1847 m and 10775 &amp#x0d m general civil work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise