Tender Details
Particulars | Details |
---|---|
Title |
General Mrvp Section 2/1 Survey And Demarcation Works To The Land On Both Sides Upstream And Downstream Of Proposed Rcb At Arunapuram In Pala Municipality General Civil Work
|
Description |
General Mrvp Section 2/1 Survey And&Amp#X0d
Demarcation Works To The Land On Both Sides&Amp#X0d
Upstream And Downstream Of Proposed Rcb At&Amp#X0d
Arunapuram In Pala Municipality General Civil&Amp#X0d
Work
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2025_Irrig_724062_1 |
Reference Number |
IRR/PII/TR/4705/2024_3_1_1/1 |
Tender Fee | 555 |
EMD | 5924 |
Tender Value | |
Place | Arunapuram-Pala |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1189935 |
Start Date | February 20, 2025 15:30 |
End Date |
01/03/2025 ( Expired 81 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreAnnual percentage rate contract on mes ssr 2020 for civil maintenance of doors, s , wire mesh glasses, shutter and including other connected works of f-1,f-2, f-3,f-4,f-5,f-6, f-7 and f-9 in filling area inside at ofk.
Annual percentage rate contract on mes ssr 2020 for civil maintenance of doors, s , wire mesh glasses, shutter and including other connected works of f-1,f-2, f-3,f-4,f-5,f-6, f-7 and f-9 in filling area inside at ofk.
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreWork of covering the drain on both sides from state bank of india to delhi road in ward no. 19 and 29 in the municipal area khoda-makanpur with rcc slabs and cc chequered tiles.
Work of covering the drain on both sides from state bank of india to delhi road in ward no. 19 and 29 in the municipal area khoda-makanpur with rcc slabs and cc chequered tiles.
Read moreGeneral rm 2024 25 rc 2 phase 1 under road section west eleri in kasaragod district 9 roads stretches for a length of 47.75km -general civil work general civil work
General rm 2024 25 rc 2 phase 1 under road section west eleri in kasaragod district 9 roads stretches for a length of 47.75km -general civil work general civil work
Read moreGeneral-pwd complex(mini civil station annex)-building sub division,perinthalmanna- s.r works -urgent repairs and rennovation works to pwd buildings sub division and buildings section office, perinthalmanna in malappuram dt.-electrification-
General-pwd complex(mini civil station&#x0d annex)-building sub division,perinthalmanna-&#x0d s.r works -urgent repairs and rennovation&#x0d works to pwd buildings sub division and&#x0d buildings section office, perinthalmanna in&#x0d malappuram dt.-electrification
Read moreOthers-hiring of 1 number of vehicle having cubic capacity 1000 to 1500 cc-on contract basis-dry lease without driver for the use of p. h. section, guruvayoor for six months or for 9500 km whichever comes first-general civil work
Others-hiring of 1 number of vehicle having&#x0d cubic capacity 1000 to 1500 cc-on contract&#x0d basis-dry lease without driver for the use of&#x0d p. h. section, guruvayoor for six months or for&#x0d 9500 km whichever comes first-general civil&#x0d work
Read moreConstruction work of covered drain on both sides of phoolwali gali in ward maulviganj 1 from fatehpur barabanki road to baradari mosque/culvert.
Construction work of covered drain on both sides of phoolwali gali in ward maulviganj 1 from fatehpur barabanki road to baradari mosque/culvert.
Read moreGeneral-running contract work 2025 - 2026-annual maintenance/repair and premonsoon works in various buildings under kuttippuram buildings section -general civil work-1
General-running contract work 2025 - 2026-annual maintenance/repair and premonsoon works in various buildings under kuttippuram buildings section -general civil work-1
Read moreGeneral rectification kip lbmc rectification and leak arresting works to kunnumanal chittar moolakkayam, ayiranalloore and manalil aqueducts and main canal in between ch 1847 m and 10775 m general civil work
General rectification kip lbmc rectification and leak arresting works to kunnumanal chittar &#x0d moolakkayam, ayiranalloore and manalil aqueducts and main canal in between ch 1847 m and 10775 &#x0d m general civil work
Read moreof your Industry type