Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Boundary Wall With Gate (Length 200 Mtr.) Land Development With Approach Road Including Internal Drain At H/W Site Construction Of Guard Room With Toilet At Baliapur Under Barabani Block In Improvement Of Rcfa Part I
|
Description |
Construction Of Boundary Wall With Gate (Length 200 Mtr.) Land Development With Approach Road Including Internal Drain At H/W Site Construction Of Guard Room With Toilet At Baliapur Under Barabani Block In Improvement Of Rcfa Part I W/S Scheme Unde
|
Organisation | Government of West Bengal |
Tender Id | 2023_PHED_541651_1 |
Reference Number |
NIeT_06_EE_2023_24 |
Tender Fee | |
EMD | 63328 |
Tender Value | |
Place | ASANSOL |
Link | https://wbtenders.gov.in |
Start Date | June 10, 2023 23:30 |
End Date |
26/06/2023 ( Expired 723 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance work under provision of high security boundary wall with concertina coil of barbed wire ,main guard room and security watch towers at frazerganj under ge(i) (cgn) kolk
Balance work under provision of high security boundary wall with concertina coil of barbed wire ,main guard room and security watch towers at frazerganj under ge(i) (cgn) kolk
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read more02/nkda/se-pgv/2025-26 development of muslim burial ground including toilet block, washing zone security room with internal roads at ghuni , new town kolkata under nkda
Development of muslim burial ground including toilet block, washing zone security room with internal roads at ghuni , new town kolkata under nkda.
Read moreProvn of compound wall with gate and watch tower in 4032 sq mtr (01 acre) land for radar station at suhelipar island under dhq-12 kavaratti under ge (navy) lakshadweep
Provn of compound wall with gate and watch tower in 4032 sq mtr (01 acre) land for radar station at suhelipar island under dhq-12 kavaratti under ge (navy) lakshadweep
Read moreConstruction of buttress wall at the toe of existing waste dump of 11ml (200 mtr length) dep 11c mines biom kirandul complex
Construction of buttress wall at the toe of existing waste dump of 11ml (200 mtr length) dep 11c mines biom kirandul complex
Read moreConstruction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement
Construction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement
Read moreConstruction of 100 seated working women hostel along with construction of hall for indoor game gym, construction of boundary wall l. 270.00 mtr. around the building construction of park for children outside the building at ad nagar under rd agart
Construction of 100 seated working women hostel along with construction of hall for indoor game gym, construction of boundary wall l. 270.00 mtr. around the building construction of park for children outside the building at ad nagar under rd agart
Read moreConstruction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of brick boundary wall and iron gate with rcc gate post and raising low site at dto and secy. rta office buildibng at charaideo under chararideo district territorial building division,sonari
Construction of brick boundary wall and iron gate with rcc gate post and raising low site at dto and secy. rta office buildibng at charaideo under chararideo district territorial building division,sonari
Read moreof your Industry type