Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply And Fixing Of Ups Backup System Of 02 Nos Of Weighbridges At Karma Ocp Under Kuju Area
|
| Description |
Supply And Fixing Of Ups Backup System Of 02 Nos Of Weighbridges At Karma Ocp Under Kuju Area
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_321220_1 |
|
Reference Number |
GM (K)/EnM/eTender/24-25/229 |
| Tender Fee | 0 |
| EMD | 2800 |
| Tender Value | - |
| Place | GM UNIT KUJU |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=332966 |
| Start Date | November 16, 2024 16:30 |
| End Date |
Expired
26/11/2024
Expired 688 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Installation of motor protection relay system in 03 nos. 3.3kv ht starters at karma project under kuju area.
Installation of motor protection relay system in 03 nos. 3.3kv ht starters at karma project under kuju area.
Read moreRewiring/repairing of enm workshop and unit store of topa ocp under kuju area.
Rewiring/repairing of enm workshop and unit store of topa ocp under kuju area.
Read moreExtension of lan connection for road sale weighbridges along with 5 years camc after completion of work at siarmal ocp, mahalaxmi area.
Extension of lan connection for road sale weighbridges along with 5 years camc after completion of work at siarmal ocp, mahalaxmi area.
Read moreExtension of lan connection for road sale weighbridges along with 5 years camc after completion of work at siarmal ocp, mahalaxmi area.
Extension of lan connection for road sale weighbridges along with 5 years camc after completion of work at siarmal ocp, mahalaxmi area.
Read moreUps 1kva with 30 minutes back up through maint. free battery (n6130-004366),ups-5kav with ext. batteries for 02 hours back up iso certifi (n6130-004367),ups 2kva online with smf battery, 2hrs backup (n7440-p030946)
Ups 1kva with 30 minutes back up through maint. free battery (n6130-004366),ups-5kav with ext. batteries for 02 hours back up iso certifi (n6130-004367),ups 2kva online with smf battery, 2hrs backup (n7440-p030946)
Read morePower backup invertor for cameras,power backup battery,power cable 2core 10sqmm aluminium for connected camera power for far,power cable 2 core 1.5sqmm copper for power to invertor nearest point,power board for invertor connection,3pin socket for backup connection,outdoor weather proof protection unit for ups,installation,testing docus
Power backup invertor for cameras,power backup battery,power cable 2core 10sqmm aluminium for connected camera power for far,power cable 2 core 1.5sqmm copper for power to invertor nearest point,power board for invertor connection,3pin socket for backup connection,outdoor weather proof protection unit for ups,installation,testing docus
Read moreProviding and fixing of 02 nos. variable electric field balance veb at weighbridge and substation of lajkura ocp, ib valley area.
Providing and fixing of 02 nos. variable electric field balance veb at weighbridge and substation of lajkura ocp, ib valley area.
Read moreProviding, laying and fixing rain gun sprinkler for suppression of dust from fugitive dust emission in trs, coal stock and siding at baroud ocp of raigarh area
Providing, laying and fixing rain gun sprinkler for suppression of dust from fugitive dust emission in trs, coal stock and siding at baroud ocp of raigarh area
Read moreProvn of 35 kva generator set and replacement of 82.5 kva dg set qty 02 and provn of two 100 kva three phase online ups with 45 minutes backup time and 160 kva transformer and connected work
Provn of 35 kva generator set and replacement of 82.5 kva dg set qty 02 and provn of two 100 kva three phase online ups with 45 minutes backup time and 160 kva transformer and connected work
Read moreInteractive panel 98 inch,intel pc high end i9 with s 11 pro,ups 20 kva with 30 backup,firewall 500 user,l3 switch manageable 24 port,kvm switch 16 port,biometric access control,power cable 3 core 10 min,environmental control device,changeover 63 amp,stabilizer 30 kva,surge protection equipment,surveillance camera,capping casing
Interactive panel 98 inch,intel pc high end i9 with s 11 pro,ups 20 kva with 30 backup,firewall 500 user,l3 switch manageable 24 port,kvm switch 16 port,biometric access control,power cable 3 core 10 min,environmental control device,changeover 63 amp,stabilizer 30 kva,surge protection equipment,surveillance camera,capping casing
Read moreof your Industry type