Tender Details

About Tender

🚚🏭 Invitation For Bids: Coal Transportation Services 🚤 The Information Technology Electronics And Communication Department, Telangana, Invites Bids From Experienced Service Providers For The Transportation Of Coal From Gdkcm (No.22 A And No.5) To Designated Consolidated Holding Points (Ch Ps) Within The State For A One Year Period. 📅 Bid Submission Deadline: May 22, 2024, 3:00 Pm Tender Fee: Inr 11,800 Emd: Inr 15,76,800 Interested Bidders Must Demonstrate Their Capability To Handle The Logistics And Transportation Of Coal On A Weight Basis, Ensuring Timely And Efficient Delivery To The Specified Ch Ps. Keywords: Coal Transportation, It & Electronics Department, Telangana, Government Contract, Bid, Emd, Tender, Chp, Chp, Consolidated Holding Point
Particulars Details
Title
Transportation Of Coal From Gdkcm (No.22 A And No.5) To Oc 1 Chp, Rg Iii Area And Gdk 1 Chp, Rg I Area On Weight Basis For A Period Of One Year.
Description
Transportation Of Coal From Gdkcm (No.22 A And No.5) To Oc 1 Chp, Rg Iii Area And Gdk 1 Chp, Rg I Area On Weight Basis For A Period Of One Year.
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 513766
Reference
Number
E1424O0023
Tender Fee 11800
EMD 15.77 Lakh
Tender Value -
Place TS
Link
View Original Tender Notice

http://eprocurement.telangana.gov.in/

Start Date May 15, 2024 23:30
End Date
Expired 22/05/2024

Expired 874 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Outsourcing of amc for 400 tph rec feeders at chp, rg ocm-1 for a period of 2 years

Outsourcing of amc for 400 tph rec feeders at chp, rg ocm-1 for a period of 2 years

Read more
Periodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.

Periodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Outsourcing contract for supply of 06 persons per day for canteen services including cooking, serving of food and maintenance of canteen at gdk-1 and 3 incline, rg.1 area for a period of two (2) years under unit rate system

Outsourcing contract for supply of 06 persons per day for canteen services including cooking, serving of food and maintenance of canteen at gdk-1 and 3 incline, rg.1 area for a period of two (2) years under unit rate system

Read more
Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.

Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.

Read more
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.

Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.

Read more
Transportation of coal from ktk oc-ii ktk oc-iii, bhp area to gdk ocp-1 chp of rg-iii area and gdk-6 chp of rg-ii area on weight basis for a period of one year.

Transportation of coal from ktk oc-ii ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area and gdk-6 chp of rg-ii area on weight basis for a period of one year.

Read more
Transportation of coal from ktk oc-iii to gdk-1 chp of rg-i area on weight basis for a period of 2 years.

Transportation of coal from ktk oc-iii to gdk-1 chp of rg-i area on weight basis for a period of 2 years.

Read more
Transportation of coal from ktk oc iii to gdk oc-i chp

Transportation of coal from ktk oc iii to gdk oc-i chp of rg-iii area for a period of 2months under unit rate system.

Read more
Transportation of coal from ktk oc iii to gdk 6 chp

Transportation of coal from ktk oc iii to gdk 6 chp of rg-ii area for a period of 2months under unit rate system

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise