Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚚🏭 Invitation For Bids: Coal Transportation Services 🚤 The Information Technology Electronics And Communication Department, Telangana, Invites Bids From Experienced Service Providers For The Transportation Of Coal From Gdkcm (No.22 A And No.5) To Designated Consolidated Holding Points (Ch Ps) Within The State For A One Year Period. 📅 Bid Submission Deadline: May 22, 2024, 3:00 Pm Tender Fee: Inr 11,800 Emd: Inr 15,76,800 Interested Bidders Must Demonstrate Their Capability To Handle The Logistics And Transportation Of Coal On A Weight Basis, Ensuring Timely And Efficient Delivery To The Specified Ch Ps. Keywords: Coal Transportation, It & Electronics Department, Telangana, Government Contract, Bid, Emd, Tender, Chp, Chp, Consolidated Holding Point| Particulars | Details |
|---|---|
| Title |
Transportation Of Coal From Gdkcm (No.22 A And No.5) To Oc 1 Chp, Rg Iii Area And Gdk 1 Chp, Rg I Area On Weight Basis For A Period Of One Year.
|
| Description |
Transportation Of Coal From Gdkcm (No.22 A And No.5) To Oc 1 Chp, Rg Iii Area And Gdk 1 Chp, Rg I Area On Weight Basis For A Period Of One Year.
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 513766 |
|
Reference Number |
E1424O0023 |
| Tender Fee | 11800 |
| EMD | 15.77 Lakh |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | May 15, 2024 23:30 |
| End Date |
Expired
22/05/2024
Expired 874 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Outsourcing of amc for 400 tph rec feeders at chp, rg ocm-1 for a period of 2 years
Outsourcing of amc for 400 tph rec feeders at chp, rg ocm-1 for a period of 2 years
Read morePeriodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Periodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreOutsourcing contract for supply of 06 persons per day for canteen services including cooking, serving of food and maintenance of canteen at gdk-1 and 3 incline, rg.1 area for a period of two (2) years under unit rate system
Outsourcing contract for supply of 06 persons per day for canteen services including cooking, serving of food and maintenance of canteen at gdk-1 and 3 incline, rg.1 area for a period of two (2) years under unit rate system
Read moreHiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.
Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.
Read moreTransportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Read moreTransportation of coal from ktk oc-ii ktk oc-iii, bhp area to gdk ocp-1 chp of rg-iii area and gdk-6 chp of rg-ii area on weight basis for a period of one year.
Transportation of coal from ktk oc-ii ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area and gdk-6 chp of rg-ii area on weight basis for a period of one year.
Read moreTransportation of coal from ktk oc-iii to gdk-1 chp of rg-i area on weight basis for a period of 2 years.
Transportation of coal from ktk oc-iii to gdk-1 chp of rg-i area on weight basis for a period of 2 years.
Read moreTransportation of coal from ktk oc iii to gdk oc-i chp
Transportation of coal from ktk oc iii to gdk oc-i chp of rg-iii area for a period of 2months under unit rate system.
Read moreTransportation of coal from ktk oc iii to gdk 6 chp
Transportation of coal from ktk oc iii to gdk 6 chp of rg-ii area for a period of 2months under unit rate system
Read moreof your Industry type