Tender Details
Particulars | Details |
---|---|
Title |
Upc N/04007/14001/Ts Short Term Improvements And Routine Maintenance Of 4/6 Lane With Paved Shoulder Stretch From Km 40.000 To Km 100.000 On Hyderabad To Vijayawada Section Of Nh 65 In The State Of Telangana.
|
Description |
Upc N/04007/14001/Ts Short Term Improvements And Routine Maintenance Of 4/6 Lane With Paved Shoulder Stretch From Km 40.000 To Km 100.000 On Hyderabad To Vijayawada Section Of Nh 65 In The State Of Telangana.
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_202841_1 |
Reference Number |
NHAI/RO-HYD/NH-65/HYD-VJW/OnM /Pkg-I/2024/ |
Tender Fee | 50000 |
EMD | 12.2 Lakh |
Tender Value | |
Place | Km 40 to Km 100 on Hyderabad to Vijayawada NH 65. |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=221890 |
Start Date | July 27, 2024 14:30 |
End Date |
09/08/2024 ( Expired 255 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreProviding short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Providing short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreRehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode
Rehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode.
Read moreConstruction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Read moreConstruction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Read moreof your Industry type