Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bos Works For Setting 50 Mw Spp In Mined Out Land In Mine Ii, Neyveli With 3 Years O&M.
|
| Description |
Bos Works For Setting 50 Mw Spp In Mined Out Land In Mine Ii, Neyveli With 3 Years O&M.
|
| Organisation | Neyveli Lignite Corporation Limited | Public Sector Undertakings |
| Tender Id | 2324000405 |
|
Reference Number |
2324000405 |
| Tender Fee | 10000 |
| EMD | 41.67 Lakh |
| Tender Value | |
| Place | Neyveli |
| Link |
View Original Tender Notice
https://procure.nlcindia.in/specification/tender/2324000405 |
| Start Date | December 31, 2023 00:30 |
| End Date |
Expired
10/01/2024
Expired 887 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w
Rfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w
Read moreFireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Fireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Read morePlanning, designing and construction of residential and non residential infrastructure in phasei for establishment of cisf 12th reserve battalion at village jamunia talab, dist sehore (mp) pkg-i in epc mode-i. sh: c/o 242 nos. t-ii qtrs (15 blocks of stilt plus 4 and 1 block of gf), 12 nos t-iii qtrs (stilt plus 3), 5 nos t-i qtrs (g plus 2), 2 nos t-v qtrs. (duplex), training block (g plus 1), 10 bedded hospital (g plus 1), gos mess (gf), single accommodation for 57 sos (g plus 2), store block and tradesmen shop (g plus1), 701 mens barracks 3 blocks (g plus 2), quarter guard (gf), admin/ communication block (g plus 2), dhobi ghat (gf), 2 nos. elect sub stations, stp, 2 nos. ug sumps with pump rooms, i/c internal w/s, sanitary and ei, lifts, dg sets, fire alarm system, firefighting, solar pv power generation system, cctv system, air conditioning system, external civil and electrical service connections, and comprehensive development works .................. bulk services.
Read moreBos works for setting up of 810 mw (410mw & 400mw ) spp in rvunl park at rajasthan with o&m 3years
Bos works for setting up of 810 mw (410mw & 400mw ) spp in rvunl park at rajasthan with o&m 3years
Read moreBorrowing of rtl ?2669 cr. for setting up 600 mw spp in at khavda, gujarat.
Borrowing of rtl ?2669 cr. for setting up 600 mw spp in at khavda, gujarat.
Read moreBos works for setting up of 600 mw (6x100mw) grid connected solar power project at khavda, gujarat
Bos works for setting up of 600 mw (6x100mw) grid connected solar power project at khavda, gujarat
Read moreExcavation and transportation of 3.0 lakh ton of lgnite from l3, l3 and old b/3 platform in mine-ii
Excavation and transportation of 3.0 lakh ton of lgnite from l3, l3 and old b/3 platform in mine-ii
Read moreSetting up of 49.5 mw wind power project at papadahandi, odisha with o&m for 10 yrs
Setting up of 49.5 mw wind power project at papadahandi, odisha with o&m for 10 yrs
Read moreSupply, installation, testing and commissioning of surveillance system at identified locations around water bos of lcma -phase-ii along with o and m of three years for phase-i and phase-ii works
Supply, installation, testing and commissioning of surveillance system at identified locations around water bos of lcma -phase-ii along with o and m of three years for phase-i and phase-ii works
Read moreDesign, engineering, construction, fabrication, erection, supply, installation, testing and commissioning of 5 mw spp including power evacuation and 5 years comprehensive o and m
Design, engineering, construction, fabrication, erection, supply, installation, testing and commissioning of 5 mw spp including power evacuation and 5 years comprehensive o and m
Read moreof your Industry type