Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Cement Concrete Road In Ramai Nagar At Chincholi Tq. Mangrulpir Dt. Washim Under Schedule Cast And Navbaudha Wasti Vikas 2024 25
|
Description |
Construction Of Cement Concrete Road In Ramai Nagar At Chincholi Tq. Mangrulpir Dt. Washim Under Schedule Cast And Navbaudha Wasti Vikas 2024 25
|
Organisation | RDD-CEO-WASHIM | State Govt. and UT |
Tender Id | 2025_WASHI_1197862_1 |
Reference Number |
CHINCHOLI/Notice/02-25-26 |
Tender Fee | 1000 |
EMD | 6000 |
Tender Value | |
Place | CHINCHOLI |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2074923 |
Start Date | July 05, 2025 21:05 |
End Date |
11/07/2025 ( Expired 8 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreConstruction of c.c. road and drain at village badori main road to heera bhumiya mandir and ramveer house and harinivas house zone no.25 ward no.66. file no.61/25x3/6.
Construction of c.c. road and drain at village badori main road to heera bhumiya mandir and ramveer house and harinivas house zone no.25 ward no.66. file no.61/25x3/6.
Read moreConstruction of c.c. road and drain at village salupura different street zone no.25 ward no.66. file no.116/25x3/6.
Construction of c.c. road and drain at village salupura different street zone no.25 ward no.66. file no.116/25x3/6.
Read moreConstruction of c.c. road and drain work at village lakhnoti kala zone no. 25 ward no. 66 file no. 101/25x3/6
Construction of c.c. road and drain work at village lakhnoti kala zone no. 25 ward no. 66 file no. 101/25x3/6
Read moreConstruction of c.c. road and drain at village betal singh ke niwas se attar singh tak evam gulab singh wali gali zone no.25 ward no.66. file no.217/25x3/6.
Construction of c.c. road and drain at village betal singh ke niwas se attar singh tak evam gulab singh wali gali zone no.25 ward no.66. file no.217/25x3/6.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreManufacture and supply of 90000 nos. of 8 0m wl 200kg psc poles as per rec design cast in twin mould form boxes at samayanallur psc yard in madurai region for a period of three years with form boxes under contractors scope.
Manufacture and supply of 90000 nos of 8 0m wl200kg psc poles as per rec design cast in twin mould form boxes at samayanallur psc yard in madurai region for a period of three years with form boxes under contractor s scope.
Read moreof your Industry type