Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Gadarwara To Chichali Road Missing Length 980 To 1200 Chanage Length 0.22 K.M. Under Sub. Division Gadarwara. (5th Call)
|
| Description |
Construction Of Gadarwara To Chichali Road Missing Length 980 To 1200 Chanage Length 0.22 K.M. Under Sub. Division Gadarwara. (5th Call)
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_284463_5 |
|
Reference Number |
NIT/12/2023-24/03 |
| Tender Fee | 2000 |
| EMD | 30500 |
| Tender Value | |
| Place | EE PWD (B and R) Division Narsinghpur |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | August 11, 2023 22:35 |
| End Date |
Expired
23/08/2023
Expired 1043 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Construction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Read moreShifting dismantling of 33kv dilighat feeder for construction of new 33kv avfccl feeder under namrup electrical sub division
Shifting dismantling of 33kv dilighat feeder for construction of new 33kv avfccl feeder under namrup electrical sub division
Read moreWork related to operation of completed jjm schemes for maintaining water supply in fy 2025-26 under sub division aburoad,dn aburoad
Work related to operation of completed jjm schemes for maintaining water supply in fy 2025-26 under sub division aburoad,dn aburoad
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreInstallation of drop gates at pallishree more and kalipur more for additional protection of height barriers on kalipur bridge and construction of temporary staying rooms for duty personnel, arambagh under hooghly construction sub division i, pwdte, u
Read moreCleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreA/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
A/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreUnder district sultanpur, construction of cc road from dulhapur gram sabha to maharajganj road, lot no 7
Under district sultanpur, construction of cc road from dulhapur gram sabha to maharajganj road, lot no 7&#x0d
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreof your Industry type