Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
61650 Annual Plan Dpt Tsr 2023 24 Pazhayannur Gp Construction Of Kalleppadam Aalthara Kallamkadu Road Pazhayannur Bp (Pro.No.981/24) In Pazhayannur Bp General Civil Work
|
Description |
61650 Annual Plan Dpt Tsr 2023 24 Pazhayannur
Gp Construction Of Kalleppadam Aalthara
Kallamkadu Road Pazhayannur Bp
(Pro.No.981/24) In Pazhayannur Bp General
Civil Work
|
Organisation | Government of Kerala |
Tender Id | 2023_LSGD_614335_66 |
Reference Number |
TN-5/2023-24 |
Tender Fee | 1870 |
EMD | 21175 |
Tender Value | |
Place | LSGD DIVISION, THRISSUR |
Link | https://etenders.kerala.gov.in |
Start Date | October 21, 2023 23:30 |
End Date |
30/10/2023 ( Expired 593 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConstruction of cc road at brijkishor shrivastav,kourav ji satyendra wali gali in pawansut colony ward no.60 zone no.14.file no.24/25x3/6.
Construction of cc road at brijkishor shrivastav,kourav ji satyendra wali gali in pawansut colony ward no.60 zone no.14.file no.24/25x3/6.
Read moreConstruction work of m-30 c.c road from pappu verma house near ravidas tempel in indranagar under ward number 78
Construction work of m-30 c.c road from pappu verma house near ravidas tempel in indranagar under ward number 78
Read moreLac-ads-providing paving of tiles in anganavadi varnamnagar-improvements to aganavadi varnamnagar road in ward 19 of edathala grama panchayath.-general civil work
Very&#x0d pathetic condition due to waterlogged area .this&#x0d estimate is proposed to upgrade the road&#x0d with 100 mm interlocking tile works and&#x0d provisions for earth filling, gsb, wmm,pcc ,&#x0d dr masonary and naming board are inluded in&#x0d this estimate.
Read moreConstruction of kc drain, road protection work and road signage and strengthening by dbm, bc in khatima-melaghat (state road no. 107) under central road and infrastructure fund
Construction of kc drain, road protection work and road signage and strengthening by dbm, bc in khatima-melaghat (state road no. 107) under central road and infrastructure fund
Read moreConstruction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Construction of 2l- ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Read moreof your Industry type