Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Gi Nipple 1/2 X 5 Outer Thread On Length 1/2 From One End
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106570479 |
|
Reference Number |
98246329 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/012025/106570479/viewNitPdf_4824449.pdf |
| Start Date | January 03, 2025 22:57 |
| End Date |
Expired
10/01/2025
Expired 539 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring mini lorry (having capacity below 5 ton and age not older than 15 years as on the date of expiry of contract) for the use of electrical division , kattakada for a period of one year from july 2026
Hiring mini lorry (having capacity below 5 ton and age not older than 15 years as on the date of expiry of contract) for the use of electrical division , kattakada for a period of one year from july 2026
Read moreWidening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreTransportation of imported coal or indian coal or raw lignite or limestone from tnpl unit 1, kagithapuram to tnpl unit 2 at kagithanagar through truck or tipper
Transportation of imported coal or indian coal or raw lignite or limestone from tnpl unit 1, kagithapuram to tnpl unit 2 at kagithanagar through truck or tipper
Read moreCa no. ge af no.1/gur-16/2026-27 repair to concealed gi pipe lines of officer quarter, repair to seepage from sunken slab alongwith kitchen sunken portion and other associated works in certain qtrs of sekhon vihar area at af stn palam under ge (af)
Ca no. ge af no.1/gur-16/2026-27 repair to concealed gi pipe lines of officer quarter, repair to seepage from sunken slab alongwith kitchen sunken portion and other associated works in certain qtrs of sekhon vihar area at af stn palam under ge (af)
Read morePfs hyaluronic acid for ortho cases.1)sodium hyaluronic acid of higher concentration equal or more than 60mg/3ml.2)should be of higher molecular weight 5 million dalton.3)highly cross linked and stabilised for long duration of action.4)non avion source.5) certificate to be attached with the offer.
For complete deion and other details, please refer to tender
Read moreIe services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Ie services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreImprovement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Improvement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Read moreof your Industry type