Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Overhauling Of Auxiliary Motors Of 3 Phase Wap7/Wag9 Electric Locomotives Of Diesel Loco Shed Kjm For A Period Of 2 Years
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78221185 |
|
Reference Number |
KJM-OT-06-OH-Auxiliary |
| Tender Fee | 0 |
| EMD | 94300 |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/112024/78221185/viewNitPdf_4760353.pdf |
| Start Date | October 30, 2024 22:12 |
| End Date |
Expired
21/11/2024
Expired 695 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance ofroofmountedcabhvac units during minorandmajor schedules of 3-phase electric locomotives at diesel loco shed, kjm includingreplacement of spares for a period of two years.
Annual maintenance ofroofmountedcabhvac units during minorandmajor schedules of 3-phase electric locomotives at diesel loco shed, kjm includingreplacement of spares for a period of two years.
Read moreSet of labyrinth and bearing cap driving end (de) for wap7/wag9 traction motors type 6fra 6068 consisting of 4 items and set of labyrinth ring ,bearing cap & clamp plate non driving end (nde) for wap7/wag9 traction motors type 6fra 6068 consisting of 4 items as per attached annexure.
Set of labyrinth and bearing cap driving end (de) for wap7/wag9 traction motors type 6fra 6068 consisting of 4 items and set of labyrinth ring ,bearing cap & clamp plate non driving end (nde) for wap7/wag9 traction motors type 6fra 6068 consisting of 4 items as per attached annexure.
Read moreOverhauling and repairs of different makes of air dryers (make - m/s trident &m/s prag polymers) fitted in 3-phase electric locomotives at diesel loco shed, krishnarajapuram for a period of three (03) years.
Overhauling and repairs of different makes of air dryers (make - m/s trident &m/s prag polymers) fitted in 3-phase electric locomotives at diesel loco shed, krishnarajapuram for a period of three (03) years.
Read moreRepair/rehabilitation of e-70 brake panel of 3-phase electric locomotives.
Repair/rehabilitation of e-70 brake panel of 3-phase electric locomotives.
Read moreMotor for machine room blower for wap7 & wag9 (3-phase) class of locomotives as per clw s spec. no.-clw/es/3/0020(alt.-h) & rdso s spec. no.-e-10/3/09(motor ) with amendment nos.-01 to 06.
Motor for machine room blower for wap7 & wag9 (3-phase) class of locomotives as per clw s spec. no.-clw/es/3/0020(alt.-h) & rdso s spec. no.-e-10/3/09(motor ) with amendment nos.-01 to 06.
Read moreTerminal board assembly for 3-phase tm of wap7/wag9 as per clws drg. no. 2twd.096.019 (alt.-1) & clws spec. no.4tms.096.025 (rev-01).
Terminal board assembly for 3-phase tm of wap7/wag9 as per clws drg. no. 2twd.096.019 (alt.-1) & clws spec. no.4tms.096.025 (rev-01).
Read moreOne yearly, three yearly and six yearly overhauling of controller asm dynamic brake of hhp locomotives at diesel loco shed, kalyan for a period of two years
One yearly, three yearly and six yearly overhauling of controller asm dynamic brake of hhp locomotives at diesel loco shed, kalyan for a period of two years
Read moreEnd frame non driving end assly. (machined) of wap7/wag9 loco for traction motor (type 6fra6068) as per clw/drg.no.0twd.096.003/ref.5 alt.13. or latest and clw specification no.4tms.096.068 rev-2, alt-3 or latest.
End frame non driving end assly. (machined) of wap7/wag9 loco for traction motor (type 6fra6068) as per clw/drg.no.0twd.096.003/ref.5 alt.13. or latest and clw specification no.4tms.096.068 rev-2, alt-3 or latest.
Read moreSupply, installation, testing and commissioning of control office equipment for data retrieval and analytics system for 3 phase electric passenger locomotives at els/gmo.
Supply, installation, testing and commissioning of control office equipment for data retrieval and analytics system for 3 phase electric passenger locomotives at els/gmo.
Read moreMicroprocessor based electronic speed cum energy monitoring system (esmon) for three phase electric locomotives as per rdso specification no. elrs/spec/spm/0002 (rev.4) of july 2018 or latest, make :- medha only.
Microprocessor based electronic speed cum energy monitoring system (esmon) for three phase electric locomotives as per rdso specification no. elrs/spec/spm/0002 (rev.4) of july 2018 or latest, make :- medha only.
Read moreof your Industry type