Construction Of Rcc Tunnel With Earth Rubber Cushion After Reclaiming The Damaged Nh 05 From Km 347 250 To 347 510 In The State Of Himachal Pradesh
|
| Description |
Construction Of Rcc Tunnel With Earth Rubber Cushion After Reclaiming The Damaged Nh 05 From Km 347 250 To 347 510 In The State Of Himachal Pradesh
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_774551_1 |
|
Reference Number |
PW-CE-NH-CTR-Tender Notice/EPC-56/2023- 3588-95 |
| Tender Fee | 10000 |
| EMD | 72.14 Lakh |
| Tender Value | - |
| Place | Office of Chief Engineer NH HP PWD Shimla 2 |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | November 01, 2023 16:30 |
| End Date |
Expired
20/11/2023
Expired 1059 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rcc tunnel with earth rubber cushion after reclaiming the damaged nh 05 from km 347 250 to 347 510 in the state of himachal pradesh sh formation cutting from km 347 250 to 347 520 c o r wall and edge wall with steel dowels from km
Construction of rcc tunnel with earth rubber cushion after reclaiming the damaged nh 05 from km 347 250 to 347 510 in the state of himachal pradesh sh formation cutting from km 347 250 to 347 520 c o r wall and edge wall with steel dowels from km
Read moreRestoration of rain damages on nh-05 km 236/00 to 368/00 (sh. removal of massive land slide/fallen debris from abandoned portion of nh-05 at urni dhank at km 347/250 to 347/520).
Restoration of rain damages on nh-05 km 236/00 to 368/00 (sh. removal of massive land slide/fallen debris from abandoned portion of nh-05 at urni dhank at km 347/250 to 347/520).
Read moreRestoration of rain damages on nh-05 km 236/00 to 368/00 (sh. removal of massive land slide/fallen debris from abandoned portion of nh-05 at urni dhank at km 347/250 to 347/520).
Restoration of rain damages on nh-05 km 236/00 to 368/00 (sh. removal of massive land slide/fallen debris from abandoned portion of nh-05 at urni dhank at km 347/250 to 347/520).
Read moreEst for prov 250 kva , 110.4 kv package sstn for modern abattoir at darni ka bagicha under esd, sub head emergent reformation of structure after the landslide, due to heavy rainfall of damged 110.4 kv, 250 kva sstn for bio conversion plant at lalpani
Est for prov 250 kva , 110.4 kv package sstn for modern abattoir at darni ka bagicha under esd, sub head emergent reformation of structure after the landslide, due to heavy rainfall of damged 110.4 kv, 250 kva sstn for bio conversion plant at lalpani
Read moreA/r and m/o on chakki baniklhet chamba bharmour road nh 154a km 106/0 to 172/0 ( sh c/o p.c.c pusta with dowel bars at rd 131/500 to 131/510 ( under or new)
A/r and m/o on chakki baniklhet chamba bharmour road nh 154a km 106/0 to 172/0 ( sh c/o p.c.c pusta with dowel bars at rd 131/500 to 131/510 ( under or new)
Read moreR/r damages on nh-305 sainj luhri aut road km 0/000 to 97/000 (sh. c/o wire crate r/wall at rd 48/250 to 48/270) (under fdr 2023-24)
R/r damages on nh-305 sainj luhri aut road km 0/000 to 97/000 (sh. c/o wire crate r/wall at rd 48/250 to 48/270) (under fdr 2023-24)
Read moreBalance work for rectification of damages caused to bituminous pavement and road side drain for laying of phed pipelines in connection with the project work of rabongla tunnel package-iii (design chainage from km 32.500 to km 33.600) of nh-510