Tender Details

About Tender

🏭 Mtps I Mill Plant Iii Overhaul Bid Invitation 🔧🚧 Tneb Limited, A State Government Undertaking, Is Initiating A Bid For The Complete Overhauling Of The Gearbox And Associated Components At Mettur Thermal Power Station I. The Scope Of Work Includes: 🔧 Overhauling Of The Gearbox Mechanical Face Seal Assembly. 🔧 Replacement Of Worn Out Bulged Insulation Cover Plate Assembly. 🔧 Replacement Of The Scrapper Assembly. 🔧 Replacement Of Worn Out Flexi Coupling. 🗓️ The Last Date For Bid Submission Is April 18, 2024, At 2:00 Pm. A Tender Fee Of Inr 17,200 Is Applicable As An Earnest Money Deposit (Emd). Interested Vendors Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And A Timeline For Completion, Adhering To The Project's Stringent Quality And Safety Standards. Keywords: Mtps, I Mill Plant Iii, Gearbox Overhaul, Tneb Limited, Power Station, State Govt. And Ut, Bid, Engineering Services, Tender, Emd
Particulars Details
Title
Mtps I Mill Plant Iii Complete Overhauling Of Gearbox Mechanical Face Seal Assembly Worm Shaft Assembly Replacing The Worn Out Bulged Insulation Cover Plate Assembly Scrapper Assembly And Worn Out Flexi Coupling Etc
Description
Mtps I Mill Plant Iii Complete Overhauling Of Gearbox Mechanical Face Seal Assembly Worm Shaft Assembly Replacing The Worn Out Bulged Insulation Cover Plate Assembly Scrapper Assembly And Worn Out Flexi Coupling Etc
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_425411_1
Reference
Number
CE / MTPS-I / SE / M-I / MP/OT . 429/ 2023-24
Tender Fee 0
EMD 17200
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=505682

Start Date February 15, 2024 18:30
End Date
Expired 18/04/2024

Expired 911 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f

Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f

Read more
Mtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work

Mtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work

Read more
Ichp-replacement of worn out and damaged portions of carrying idler frames and replacement of worn out stringer channel assembly in conveyor-49

Ichp-replacement of worn out and damaged portions of carrying idler frames and replacement of worn out stringer channel assembly in conveyor-49

Read more
Custom bid for services - removal of the worn-out/failed undercarriage assembly and fitment of a new undercarriage assembly

Custom bid for services - removal of the worn-out/failed undercarriage assembly and fitment of a new undercarriage assembly

Read more
Mtps i tm unit ii overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit ii aoh 2026 27

Mtps i tm unit ii overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit ii aoh 2026 27

Read more
Removal of worn out under carriage assembly, repairing of damaged groove of track and carrier roller mounting in track frame and other track frame areas, assembly and fitment of under carriage assy in 8 nos. of bd355 dozer over a period of one year.

Removal of worn out under carriage assembly, repairing of damaged groove of track and carrier roller mounting in track frame and other track frame areas, assembly and fitment of under carriage assy in 8 nos. of bd355 dozer over a period of one year.

Read more
Mtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill

Mtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill

Read more
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla

Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla

Read more
Mtps i mill plant iv complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexible coupling etc

Mtps i mill plant iv complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexible coupling etc

Read more
Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh

Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise