Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Construction Opportunity: Road Over Bridge For Agra Division 🛣️ The Ministry Of Railways, Central Government, Invites Tenders For The Construction Of A 02 Lane Road Over Bridge In Mathura Palwal Section, Replacing Level Crossing No. 551 At Km 1447/0 2. 📅 Bid Submission Deadline: April 04, 2024, 3:00 Pm A Tender Security Amounting To Inr 19,44,000/ Is Required. No Tender Fee Is Payable. Interested Contractors Must Possess The Requisite Experience And Qualifications To Undertake Such A Significant Infrastructure Project. Detailed Tender Documents Are Available For Review. Keywords: Construction, Road Over Bridge, Railway Infrastructure, Ministry Of Railways, Government Tender, Level Crossing, Mathura Palwal Section, Tender Security, Emd| Particulars | Details |
|---|---|
| Title |
Agra Division Construction Of 02 Lane Road Over Bridge In Lieu Of Level Crossing No. 551 At Km. 1447/0 2 In Mathura Palwal Section.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73971402 |
|
Reference Number |
Br-AGC-2023-10 |
| Tender Fee | 0 |
| EMD | 19.44 Lakh |
| Tender Value | - |
| Place | Allahabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73971402/viewNitPdf_4500996.pdf |
| Start Date | March 11, 2024 18:58 |
| End Date |
Expired
04/04/2024
Expired 928 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Read moreCarrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Carrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Read moreConstruction of 4 robs: (i) 2 lane rob on cost sharing basis in lieu of level crossing no. 61-b (including lhs) at km 123/8-9 near mau aimma(mem) station on pratapgarh-phaphamau section of lko division of northern railway, (ii) 2 lane rob in lieu of level crossing no. 59/b (including lhs) on gajarola-muazzampur section of moradabad division of northern railway, (iii) 2 lane rob in lieu of lc no.32/a (including lhs) at k.m. 53.819 between kbe-sln railway station on ayc-sln section of lucknow d
Construction of 4 robs: (i) 2 lane rob on cost sharing basis in lieu of level crossing no. 61-b (including lhs) at km 123/8-9 near mau aimma(mem) station on pratapgarh-phaphamau section of lko division of northern railway, (ii) 2 lane rob in lieu of level crossing no. 59/b (including lhs) on gajarola-muazzampur section of moradabad division of northern railway, (iii) 2 lane rob in lieu of lc no.32/a (including lhs) at k.m. 53.819 between kbe-sln railway station on ayc-sln section of lucknow d
Read moreSr (special repair) work providing safety railing on 2-lane rob and its approaches in lieu of existing level crossing (lc no. c-61) at km 165.550 on nh-89 in nagaur city
Sr (special repair) work providing safety railing on 2-lane rob and its approaches in lieu of existing level crossing (lc no. c-61) at km 165.550 on nh-89 in nagaur city
Read moreConstruction of rob in lieu of level crossing no. 229 at km 1324/16-18 in between rpgu-bnar stations in vglj-cnb section & construction of rob in lieu of level crossing no. 367 at km 1126/20-22 at jhansi yard in bina-vglj section in jhansi division of north central railway.
Construction of rob in lieu of level crossing no. 229 at km 1324/16-18 in between rpgu-bnar stations in vglj-cnb section & construction of rob in lieu of level crossing no. 367 at km 1126/20-22 at jhansi yard in bina-vglj section in jhansi division of north central railway.
Read moreConstruction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreConstruction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Read moreElectrical work for interlocking of 3 nos. of level crossing gates (ka-48, rc-2 & mr-35) where tvu is greater than 10000 over adra division.
Electrical work for interlocking of 3 nos. of level crossing gates (ka-48, rc-2 & mr-35) where tvu is greater than 10000 over adra division.
Read moreLaunching of box segments in c/with construction of lhs (5m x 5m) in lieu of unmanned level crossing no. c-85a at km 117.492 on ldh- fzr section under aden-1/fzr.
Launching of box segments in c/with construction of lhs (5m x 5m) in lieu of unmanned level crossing no. c-85a at km 117.492 on ldh- fzr section under aden-1/fzr.
Read moreHyderabad division: sc-dhne section: 1) construction of proposed r.o.b in lieu of lc.no.60 at rly km.114/20-22 between mahabubnagar and manyamkonda stations. 2) proposed construction of 2 lane road over bridge in lieu of lc no.90a at rly km 166/500-600 between wanaprthy road(wpr) - sriram nagar (srnr) 3)proposed construction of 2 lane road over bridge in lieu of lc no 98 at km 186/500 -600 between sriramnagar (srnr)-gadwal (gwd)
Hyderabad division: sc-dhne section: 1) construction of proposed r.o.b in lieu of lc.no.60 at rly km.114/20-22 between mahabubnagar and manyamkonda stations. 2) proposed construction of 2 lane road over bridge in lieu of lc no.90a at rly km 166/500-600 between wanaprthy road(wpr) - sriram nagar (srnr) 3)proposed construction of 2 lane road over bridge in lieu of lc no 98 at km 186/500 -600 between sriramnagar (srnr)-gadwal (gwd)
Read moreof your Industry type