Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Drain At Nh 346 Satahari Farm House Under Sub Division Mungaoli Division Ashoknagar (Mp) Length 0.225 Km
|
| Description |
Construction Of Drain At Nh 346 Satahari Farm House Under Sub Division Mungaoli Division Ashoknagar (Mp) Length 0.225 Km
|
| Organisation | PWD- Roads and Bridges | State Govt. and UT |
| Tender Id | 2025_PWDRB_437742_1 |
|
Reference Number |
03/2025-26/G-8 |
| Tender Fee | 11054 |
| EMD | 89250 |
| Tender Value | - |
| Place | Ashoknagar |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=516754 |
| Start Date | July 22, 2025 16:00 |
| End Date |
Expired
11/08/2025
Expired 428 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of shadora naisarai (mdr) to gundar bagulya diyadhari road length 6.70 km under sub division ashoknagar division ashoknagar (mp)
Construction of shadora naisarai (mdr) to gundar bagulya diyadhari road length 6.70 km under sub division ashoknagar division ashoknagar (mp)
Read moreConstruction of gundar joint to bayanga ganihari derkha sihar kurayla road length- 11.50 km under sub division ashoknagar division ashoknagar mp
Construction of gundar joint to bayanga ganihari derkha sihar kurayla road length- 11.50 km under sub division ashoknagar division ashoknagar mp
Read moreCs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of budhar-umaria (nh-43), ponda nala-shahdol bypass and chilman chowk-dindori-mandla road (nh-543), and dindori-mandla road nh-45 junction and nh-543 junction dindori-kabirchabutra road (nh-45)
Read moreSpecial repair work of nh 35 from (bargarh more to nh-135b near dabhaura) on nh-135bb (length 8.00 km) in the state of madhya pradesh
Special repair work of nh 35 from (bargarh more to nh-135b near dabhaura) on nh-135bb (length 8.00 km) in the state of madhya pradesh
Read moreConsultancy services for preparation of dpr for widening to six lane of dhule palesnar (mp/mh border) section of nh-52 in the state of maharashtra (approx. length 89 km.) (2nd call).
Consultancy services for preparation of dpr for widening to six lane of dhule palesnar (mp/mh border) section of nh-52 in the state of maharashtra (approx. length 89 km.) (2nd call).
Read moreConsultancy services for preparation of dpr for oti of following stretches, pawai, kaithi and patna-tamoli of nh-943 (length 19 km), rampur baghelan of nh-39 (length 5.20 km), and amanganj and tikariya of nh-43 ext. in the state of madhya pradesh
Consultancy services for preparation of dpr for oti of following stretches, pawai, kaithi and patna-tamoli of nh-943 (length 19 km), rampur baghelan of nh-39 (length 5.20 km), and amanganj and tikariya of nh-43 ext. in the state of madhya pradesh
Read moreOne time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.
One time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.
Read moreRisk and cost work for work of sarvardevla to pal (mp/mh border) road section of nh-347c from design chainage 81.600 km to 137.400 km (total length 55.80 km) in the state of madhya pradesh
Risk and cost work for work of sarvardevla to pal (mp/mh border) road section of nh-347c from design chainage 81.600 km to 137.400 km (total length 55.80 km) in the state of madhya pradesh
Read moreShort term maintenance to nh-17(new) / nh-31(old) for the year 2026-27 from (i) km 816/012 to km 829/000 (length 13.094 km) (ii) km 844/000 to km 858/000 (length 12.506 km) (total length of the project 25.600 km) under abhayapuri const. division
Short term maintenance to nh-17(new) / nh-31(old) for the year 2026-27 from (i) km 816/012 to km 829/000 (length 13.094 km) (ii) km 844/000 to km 858/000 (length 12.506 km) (total length of the project 25.600 km) under abhayapuri const. division
Read moreof your Industry type