Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Secondary Clarifier No 2 Submersible Pump And Replacement Of Analyzer Chlorination Sfc Residual Analyzer At 80 Mld Dinapur Mps At Varanasi
|
Description |
Repairing Of Secondary Clarifier No 2 Submersible Pump And Replacement Of Analyzer Chlorination Sfc Residual Analyzer At 80 Mld Dinapur Mps At Varanasi
|
Organisation | U P Jal Nigam (HQ), Lucknow | State Govt. and UT |
Tender Id | 2023_UPJNM_871810_3 |
Reference Number |
2226/ETENDER/29/04.12.2023 |
Tender Fee | 3520 |
EMD | 92000 |
Tender Value | |
Place | VARANASI |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1513772 |
Start Date | January 23, 2024 21:30 |
End Date |
08/02/2024 ( Expired 491 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Operation and maintenance of 245 mld. sbr based stp, mps- 2 nos., pumping main 1400mm dia. and 33/0.415 kv substation- 2 nos. comprising of all civil, electrical, mechanical and other allied works and utilities including specified staff at kabitk
Operation and maintenance of 245 mld. sbr based stp, mps- 2 nos., pumping main 1400mm dia. and 33/0.415 kv substation- 2 nos. comprising of all civil, electrical, mechanical and other allied works and utilities including specified staff at kabitk
Read moreProvision of gyro repair facility (fiber optic gyro) at bay-2 of refit store complex at nsry (pbr) and replacement of water fixtures with low flow fixtures in ship support complex bldg no p-185 and p-91 under ge haddo sri vijaya, sri vijaya puram
Provision of gyro repair facility (fiber optic gyro) at bay-2 of refit store complex at nsry (pbr) and replacement of water fixtures with low flow fixtures in ship support complex bldg no p-185 and p-91 under ge haddo sri vijaya, sri vijaya puram
Read moreConstruction of innovative scheme with 2 nos sbdtw,1 no. raw water reservoir with pump house and iron removal plant at newly constructed dm office complex , dharmanagar (n) district during the year 2024-25. (deposit work)
Construction of innovative scheme with 2 nos sbdtw,1 no. raw water reservoir with pump house and iron removal plant at newly constructed dm office complex , dharmanagar (n) district during the year 2024-25. (deposit work)
Read moreSpecial repair /replacement of ber and un serviceable submersible pump sets including allied works and provision of ups for selected medical eqpt installed in various location at mh jamnagar under ge (a) at inf lines jamnagar
Special repair /replacement of ber and unserviceable submersible pump sets including allied works and provision of ups for selected medical eqpt installed in various location at mh jamnagar under ge (a) at inf lines jamnagar
Read moreRepair replacement and maintenance of ht switch gears, ht distribution system, 2 4 pole structure, earthings at lake line, heig line and pump house area and repair replacement an maintenance of ht switch gears, ht distribution system, 2 4 pole struc
Repair replacement and maintenance of ht switch gears, ht distribution system, 2 4 pole structure, earthings at lake line, heig line and pump house area and repair replacement an maintenance of ht switch gears, ht distribution system, 2 4 pole struc
Read moreAlternative source of drinking water by installation of submersible pump through rig boring system and construction water reservoir with laying of 75mm dia. hdpe pipe-line at dom para slum area within ward no-01, under dmc.
Alternative source of drinking water by installation of submersible pump through rig boring system and construction water reservoir with laying of 75mm dia. hdpe pipe-line at dom para slum area within ward no-01, under dmc.
Read moreRepair or maintenance of filter bed, cleaning of sludge, cleaning of overhead and sedimentation tank, repair or replacement of sluice chamber, pipe lines, floculator system at pump house no 01 at hq eac (u) (af) under ge (i) (af) shillong
Repair or maintenance of filter bed, cleaning of sludge, cleaning of overhead and sedimentation tank, repair or replacement of sluice chamber, pipe lines, floculator system at pump house no 01 at hq eac (u) (af) under ge (i) (af) shillong
Read moreConstruction work of 2 nos -132kv feeder bay work at 400 kv s/s chhegaon (torni) substation for pump house - 01 and 02 and 1 no 33kv bay at 132kv chhegaon substation for pump house 03 and 1 nos 33kv bay at 132kv zhirniya substation for pump house - 4
Construction work of 2 nos -132kv feeder bay work at 400 kv s/s chhegaon (torni) substation for pump house - 01 and 02 and 1 no 33kv bay at 132kv chhegaon substation for pump house 03 and 1 nos 33kv bay at 132kv zhirniya substation for pump house - 4
Read more(1) complete repairing of marshilling box with self cooling system 7.5 mva transformer 11kv/6.6kv at kantapahri sub-station akwmc. (2) repair and service of bic make,6.6kv,10amp restricted neutral grounding system,sl.no.1780/80
(1) complete repairing of marshilling box with self cooling system 7.5 mva transformer 11kv/6.6kv at kantapahri sub-station akwmc. (2) repair and service of bic make,6.6kv,10amp restricted neutral grounding system,sl.no.1780/80
Read moreRepairing of 02 nos. 12.5hp submersible pump and 02 nos. 7.5hp submersible pump and rewinding/repairing of 02 nos. 12.5hp motors and 02 nos. 7.5hp motors at washery division
Repairing of 02 nos. 12.5hp submersible pump and 02 nos. 7.5hp submersible pump and rewinding/repairing of 02 nos. 12.5hp motors and 02 nos. 7.5hp motors at washery division
Read moreof your Industry type