Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Execution Of Works Of Howrah Kharagpur Section Deep Screening Of Track Ballast For Plain Track And Points &Amp X Ings At Differenct Locations Under The Jurisdiction Of Den/East/Kgp.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78910087 |
|
Reference Number |
E-KGP-EAST-54-2024 |
| Tender Fee | 0 |
| EMD | 2.17 Lakh |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78910087/viewNitPdf_4800148.pdf |
| Start Date | December 12, 2024 17:39 |
| End Date |
Expired
02/01/2025
Expired 651 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Howrah - kharagpur & santragachi - amta section: removal of shortfall for divyangjans facility in short term & medium-term basis under the jurisdiction of sr.den/east/kgp. (2nd call)
Howrah - kharagpur & santragachi - amta section: removal of shortfall for divyangjans facility in short term & medium-term basis under the jurisdiction of sr.den/east/kgp. (2nd call)
Read moreMadurai division: proposed collection and supply of 50mm machine crushed stone ballast at tamaraipadi ballast depot including loading into railway wagons, unloading and spreading in connection with track renewal works in den/north/mdu jurisdiction.
Madurai division: proposed collection and supply of 50mm machine crushed stone ballast at tamaraipadi ballast depot including loading into railway wagons, unloading and spreading in connection with track renewal works in den/north/mdu jurisdiction.
Read moreCess supply of 8800.00 cum stone ballast (machine crushed) 65 mm gauge as per revised specification of rdso track ballast of is/rdso-ge/0001:2023, february-2023 in bikaner-suratgarh section & lalgarh-phalodi section under jurisdiction of sr. den/w/bikaner.
Cess supply of 8800.00 cum stone ballast (machine crushed) 65 mm gauge as per revised specification of rdso track ballast of is/rdso-ge/0001:2023, february-2023 in bikaner-suratgarh section & lalgarh-phalodi section under jurisdiction of sr. den/w/bikaner.
Read moreExecution of p-way works in between howrah - kharagpur section - 1) ttr(cs+cmsc) 63 sets 2)trr(p) - 23.764 tkm 3) improvement of sand hump & dead end under the jurisdiction of sr.den/east/kgp. (2nd call)
Execution of p-way works in between howrah - kharagpur section - 1) ttr(cs+cmsc) 63 sets 2)trr(p) - 23.764 tkm 3) improvement of sand hump & dead end under the jurisdiction of sr.den/east/kgp. (2nd call)
Read moreManufacturing ,supplying machine crushed track ballast, stacking at sptr, nsbg, or anyother suitable yards and loading it into hoppers/wagons/ trucks for various sections/locations under the jurisdiction of sr. den/ii/tsk.
Manufacturing ,supplying machine crushed track ballast, stacking at sptr, nsbg, or anyother suitable yards and loading it into hoppers/wagons/ trucks for various sections/locations under the jurisdiction of sr. den/ii/tsk.
Read moreManufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.
Manufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.
Read moreThrough sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
Through sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
Read moreExecution of works of howrah-kharagpur section deep screening of track ballast for plain track and points & x-ings at different locations under the jurisdiction of den/east/kgp.(2nd call)
For complete deion and other details, please refer to tender
Read moreKharagpur - tatanagar : provision of ballast retainer at the bridge approaches under the jurisdiction of den/west/kgp.
For complete deion and other details, please refer to tender
Read moreExecution of works of howrah- kharagpur- tsr(p)- 69.408 tkm under the jurisdiction of den/east/kgp.
For complete deion and other details, please refer to tender
Read moreof your Industry type