Tender Details
Particulars | Details |
---|---|
Title |
Re Construction Of Gutter From Surat Bar To Dayanand Dhuri House At Rajbag Tarir In Ward No.Vi Of Cmc
|
Description |
Re Construction Of Gutter From Surat Bar To Dayanand Dhuri House At Rajbag Tarir In Ward No.Vi Of Cmc
|
Organisation | MUNICIPAL COUNCILS | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 3000 |
EMD | 8423 |
Tender Value | |
Place | Canacona |
Link |
AAAAAAAAAA Login to view |
Start Date | November 29, 2024 18:30 |
End Date |
12/12/2024 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Re-sectioning from km 0.00 to km 0.500, strengthening from km 0.00 to km 8.20 and km 15.00 to km 15.50 and widening and strengthening from km 8.20 to km 15.00 of nh-327 -old nh-31c- in the district of darjeeling, job no.554.
Re-sectioning from km 0.00 to km 0.500, strengthening from km 0.00 to km 8.20 and km 15.00 to km 15.50 and widening and strengthening from km 8.20 to km 15.00 of nh-327 -old nh-31c- in the district of darjeeling, job no.554.
Read moreConstruction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode
Construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode
Read moreDevelopment of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Development of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Read moreConstruction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode
Construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode
Read moreConsultancy services for preparation of dpr for construction of spur from amas darbhanga nearby suitable nh corridor of nh-119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar
Consultancy services for preparation of dpr for construction of spur from amas darbhanga nearby suitable nh corridor of nh-119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar
Read moreConstruction of underpass at km 539.400 (vasapul) including balance work of approaches and fob with ramp and lift facility at tejganj in the project of panagarh palsit
Construction of underpass at km 539.400 (vasapul) including balance work of approaches and fob with ramp and lift facility at km 566.540 (tejganj) on epc mode under 6-laning of nh-19 from panagarh to palsit in the state of west bengal
Read moreConstruction of c.c. road from chouhan house to sachiv house at ward no. 12 and c.c. road near aara machine to awadhiya house at ward no. 10 dindori
Construction of c.c. road from chouhan house to sachiv house at ward no. 12 and c.c. road near aara machine to awadhiya house at ward no. 10 dindori
Read moreConstruction of 4 lane with paved shoulders bypass to nalgonda town from design km 0.000 to km 14.000 length 14.00km existing ch km 18 710 to 28 685 of nakrekal to nagarjuna sagar section of nh 565 in the state of telangana on epc mode under annual
Construction of 4 lane with paved shoulders bypass to nalgonda town from design km 0.000 to km 14.000 length 14.00km existing ch km 18 710 to 28 685 of nakrekal to nagarjuna sagar section of nh 565 in the state of telangana on epc mode under annual
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreConstruction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Read moreof your Industry type