Tender Details
Particulars | Details |
---|---|
Title |
Design Development And Implementation Of Website And Web Portal Jagadguru Rambhadracharya Divyang State University Chitrakoot
|
Description |
Design Development And Implementation Of Website And Web Portal Jagadguru Rambhadracharya Divyang State University Chitrakoot
|
Organisation | UP Electronics Corporation Ltd. | State Govt. and UT |
Tender Id | 2025_UPECL_991309_1 |
Reference Number |
UPLC/Software /2024-25/125 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Lucknow |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1751048 |
Start Date | January 09, 2025 00:25 |
End Date |
16/01/2025 ( Expired 129 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Eoi for empanelment of accommodation partner for association to provide online accommodation inventory for sales on irctc tourism website and its associate porta
Eoi for empanelment of accommodation partner for association to provide online accommodation inventory for sales on irctc tourism website and its associate porta
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDevelopment, operation and maintenance of the mmlp nashik near niphad sugar factory in niphad taluka, district nashik in the state of maharashtra through ppp on dbfot basis
Development, operation and maintenance of the mmlp nashik near niphad sugar factory in niphad taluka, district nashik in the state of maharashtra through ppp on dbfot basis
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreDevelopment, operation and maintenance of wayside amenities on lease basis (5 o-m sites) (nh-752d/ ujjain-badnawar/29-050/ lhs/pipliyragho/mp)
Development, operation and maintenance of wayside amenities on lease basis (5 o-m sites) (nh-752d/ ujjain-badnawar/29-050/ lhs/pipliyragho/mp)
Read moreDevelopment, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis
Development, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreof your Industry type