Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
For The Work Of Dismantling And Replacement Of 185 Sqmm. Armoured Cable From Mine Switch Of Substation To Overhead Line Of Lfet Dam Gallery Of R.A.B.L.S. Project.
|
Description |
For The Work Of Dismantling And Replacement Of 185 Sqmm. Armoured Cable From Mine Switch Of Substation To Overhead Line Of Lfet Dam Gallery Of R.A.B.L.S. Project.
|
Organisation | Narmada Valley Development Authority | State Govt. and UT |
Tender Id | 2024_NVDA_326945_1 |
Reference Number |
188/Ts. 2023-24 |
Tender Fee | 1295 |
EMD | 2661 |
Tender Value | |
Place | BARGI NAGAR |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=383801 |
Start Date | January 17, 2024 23:00 |
End Date |
06/02/2024 ( Expired 500 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Appointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur-- sitc of dg set
Construction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur. --sitc of dg set
Read moreRepair and maintenance of water supply pipe line and sanitation work for colony quarters and offices at dvc, tilaiya dam, t. k. division konar
Repair and maintenance of water supply pipe line and sanitation work for colony quarters and offices at dvc, tilaiya dam, t. k. division konar
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreStructural repair, retrofitting and other civil maintenance work of piers, viaducts, station buildings, depot, rss and other structures of line-2 (south) from udyog bhawan to millennium city centre metro station.
Structural repair, retrofitting and other civil maintenance work of piers, viaducts, station buildings, depot, rss and other structures of line-2 (south) from udyog bhawan to millennium city centre metro station.
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreof your Industry type