Tender Details

Particulars Details
Title
Supply, Erection, Testing And Commissioning Of Electrical Motor Driven Main Pump, Centrifugal Horizontal Type, With Gland Packing Capable Of Deliver 900 Lpm At 35 Mwc For Construction Of G 1 New Building For Additional Construction In Icvp
Description
Supply, Erection, Testing And Commissioning Of&Amp#X0d Electrical Motor Driven Main Pump, Centrifugal&Amp#X0d Horizontal Type, With Gland Packing Capable Of&Amp#X0d Deliver 900 Lpm At 35 Mwc For Construction&Amp#X0d Of G 1 New Building For Additional&Amp#X0d Construction In Icvp
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id 2025_WBPWD_828425_1
Reference
Number
WBPWD/SS/EE-J.D./e-NIQ -01/2024-25
Tender Fee 0
EMD 500
Tender Value
Place Jhargram
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1844606
Start Date March 21, 2025 23:30
End Date

28/03/2025 ( Expired 46 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.

Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.

Read more
Nagpur additional butibori i.a. providing laying jointing and commissioning 900 mm dia di k 9 class pure water rising main 600 mm dia di k 9 class distribution pipeline and construction of 6000 cum rcc sump pump house and 2000 cum capacity esr

Nagpur additional butibori i.a. providing laying jointing and commissioning 900 mm dia di k 9 class pure water rising main 600 mm dia di k 9 class distribution pipeline and construction of 6000 cum rcc sump pump house and 2000 cum capacity esr

Read more
Sinking of new tubewell, supply, erection and commissioning of submersible motor and pumpincluding kiosk shed with all electrical accessories. providing, laying of distribution line, pumping main and interlinking with the existing pipe in t.s. no

Sinking of new tubewell, supply, erection and commissioning of submersible motor and pumpincluding kiosk shed with all electrical accessories. providing, laying of distribution line, pumping main and interlinking with the existing pipe in t.s. no

Read more
Nagpur additional butibori i.a. providing laying jointing and commissioning 900 mm dia di k 9 class pure water rising main 600 mm dia di k 9 class distribution pipeline and construction of 6000 cum rcc sump pump house and 2000 cum capacity esr

Nagpur additional butibori i. a. providing laying jointing and commissioning 900 mm dia di k 9 class pure water rising main 600 mm dia di k 9 class distribution pipeline and construction of 6000 cum rcc sump pump house and 2000 cum capacity esr.

Read more
Supply, delivery,erection and commissioning of 75 kw/100hp horizontal submerged centrifugal pump sets with 60 mtrs head and 310 m3/hr discharge capacity, 1500 rpm, 415 volts for raw water pumping from forebay of himayathsagar to 5 mld micro pressure filters and tspa at himayathsagar under eam section, sd-i, td-i, himayathsagar

Supply, delivery, erection and commissioning of 75 kw/100hp horizontal submerged centrifugal pump sets with 60 mtrs head and 310 m3/hr discharge capacity, 1500 rpm, 415 volts for raw water pumping from forebay of himayathsagar to 5 mld micro pressure filters and tspa at himayathsagar under eam section, sd-i, transmission division i, himayathsagar

Read more
Supply, erection testing and commissioning of 02 nos 40 hp horizontal submerged centrifugal pump at vishwabharti pump house.

Supply, erection testing and commissioning of 02 nos 40 hp horizontal submerged centrifugal pump at vishwabharti pump house.

Read more
Details of materials and its specification for the work of supplying, installation, commissioning and testing of horizontal split casing centrifugal pump having discharge 150000 gph at total head of 36 meters and 250 kva 11 0.433 kv transformer w

Details of materials and its specification for the work of supplying, installation, commissioning and testing of horizontal split casing centrifugal pump having discharge 150000 gph at total head of 36 meters and 250 kva 11 0.433 kv transformer w

Read more
Work of installation of 01 new tube well of 35 hp capacity in ward-32 moh rampur garden along with construction of pump house, electrical connection, laying of rising main line and other related works.

Work of installation of 01 new tube well of 35 hp capacity in ward-32 moh rampur garden along with construction of pump house, electrical connection, laying of rising main line and other related works.

Read more
Work of installation of 01 new tube well of 35 hp capacity in ward-06 nawada shekhan along with construction of pump house, electrical connection, laying of rising main line and other related works.

Work of installation of 01 new tube well of 35 hp capacity in ward-06 nawada shekhan along with construction of pump house, electrical connection, laying of rising main line and other related works.

Read more
Sinking of new borewell and supply erection testing and commissioning of deep well submersible motor and pumpat r.s.no.40/11 in govt. poromboke land near thangal road in soriankuppam village including laying and linking of supply main to the exi

Sinking of new borewell and supply erection testing and commissioning of deep well submersible motor and pumpat r.s.no.40/11 in govt. poromboke land near thangal road in soriankuppam village including laying and linking of supply main to the exi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise