Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement Work Of Divider Of Ganga Nagar 45 Mtrs Road From Mawana Road To Kila Road.
|
| Description |
Improvement Work Of Divider Of Ganga Nagar 45 Mtrs Road From Mawana Road To Kila Road.
|
| Organisation | Meerut Development Authority | State Govt. and UT |
| Tender Id | 2024_MDAUP_941340_1 |
|
Reference Number |
03_662 Dated 23 Jul 2024 |
| Tender Fee | 3450 |
| EMD | 81000 |
| Tender Value | |
| Place | Meerut |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1628698 |
| Start Date | July 26, 2024 21:30 |
| End Date |
Expired
07/08/2024
Expired 693 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Turip - 2025-2026 improvement to bt roads at kondasamy naidu nagar 5th cross road 167016r710 in karamadai municipality
Turip - 2025-2026 improvement to bt roads at kondasamy naidu nagar 5th cross road 167016r710 in karamadai municipality
Read more171/26-improvement work to gups vayiparamala road in ward 04 of anakkayam gp
171/26-improvement work to gups &#x0d vayiparamala road in ward 04 of anakkayam &#x0d gp
Read moreRoad construction work from karvarikalan to bandarpura village
Road construction work from karvarikalan to bandarpura village
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreRemaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Remaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Read moreCa no.cwe bly/ ge (e) /57 of 2026-27special repair to road berm in front of stn hq to sec hosp approx 450 mtrs at shahjahanpur cantt under ge (east) bareilly
Ca no.cwe bly/ ge (e) /57 of 2026-27special repair to road berm in front of stn hq to sec hosp approx 450 mtrs at shahjahanpur cantt under ge (east) bareilly
Read moreImprovement of pathways at amit pan bidi shop to annapurna society at samta nagar in beat no.152 chembur in m/west ward.
Improvement of pathways at amit pan bidi shop to annapurna society at samta nagar in beat no.152 chembur in m/west ward.
Read moreRepair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Repair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read moreProviding essential service for the period from 16.07.2026 to 31.03.2027 for the annual maintenance of commercial complex pocket 7 1st main road cit nagar chennai 035
Providing essential service for the period from 16.07.2026 to 31.03.2027 for the annual maintenance of commercial complex pocket 7 1st main road cit nagar chennai 035
Read moreof your Industry type