Tender Details

Particulars Details
Title
Train Set Frp Nose Cone Coupler Cover As Per Drg Nos.( 1.) 72610171 (Right) 1 No. ( 2) 72610172 (Left) 1 No. And Specification No. Icf/Md/Specification 383 Issue Status 01.Rev.01
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106503525
Reference
Number
95245437B
Tender Fee 0
EMD 0
Tender Value -
Place Mumbai CST
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/112024/106503525/viewNitPdf_4748853.pdf

Start Date October 21, 2024 18:22
End Date
Expired 06/11/2024

Expired 711 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Train set nose cone coupler cover for vande bharat express.

Train set nose cone coupler cover for vande bharat express.

Read more
Rubber based adhesive to icf specification no. icf/m/d/028, issue status-01 rev.-04

Rubber based adhesive to icf specification no. icf/m/d/028, issue status-01 rev.-04

Read more
Ctrb bearing for train-18/emus to drawing no.icf/sk3-0-2-025 andicf/md/specn.347 issue status 01,rev.00.

Ctrb bearing for train-18/emus to drawing no.icf/sk3-0-2-025 andicf/md/specn.347 issue status 01,rev.00.

Read more
Look out glass for train-18/dtc/ac nose cone as per icf drg. no. train- 18/dtc/ac5-4-001 alt. nil & icf drg. no. train-18/dtc/ac1-0-004 alt. d. for vande bharat train set.

Look out glass for train-18/dtc/ac nose cone as per icf drg. no. train- 18/dtc/ac5-4-001 alt. nil & icf drg. no. train-18/dtc/ac1-0-004 alt. d. for vande bharat train set.

Read more
Paint enamel interior finishing mb green is:133/2004 along with additional requirement stipulated as per icf spec. no-icfimd/spec-052 issue status 02, rev-01 with latest . is 133/2004 along with additional requirement stipulated as per icf specification no icfimd/spec-052, issue status 02 revision 01 with latest

Paint enamel interior finishing mb green is:133/2004 along with additional requirement stipulated as per icf spec. no-icfimd/spec-052 issue status 02, rev-01 with latest . is 133/2004 along with additional requirement stipulated as per icf specification no icfimd/spec-052, issue status 02 revision 01 with latest

Read more
1).paint enamel synthetic interior finishing smoke grey to isc : 692 of is:5/2007 to is: 133/2023 along with additional stipulation as per icf specification no. icf/md/spec-052 issue status 02 revision 01 date 26.05.2006. 2).paint enamel exterior black finishing to is:8662/2004 with additional requirements of spec. icf/md/spec045 issue status 02 revision 03 3) paint enamel exterior finishing pale cream to is : 8662/2004 with additional requirements of specification no icf/md/spec-045

1).paint enamel synthetic interior finishing smoke grey to isc : 692 of is:5/2007 to is: 133/2023 along with additional stipulation as per icf specification no. icf/md/spec-052 issue status 02 revision 01 date 26.05.2006. 2).paint enamel exterior black finishing to is:8662/2004 with additional requirements of spec. icf/md/spec045 issue status 02 revision 03 3) paint enamel exterior finishing pale cream to is : 8662/2004 with additional requirements of specification no icf/md/spec-045

Read more
Buffer plunger assembly. drawing no.:- rdso/sk-98145 alt. (12) items- 3, 5, 6, 7, 14 & 17 specification:- icf/md/spec-252 (rev.00) amndt. 4 (issue status 01). special terms & conditions:- buffer plunger assembly items must be supplied in assembled form. guarantee:- guarantee replacement free of cost of such casting, which may develop defects within two years(24 months) from the date of fitment or within three years (36 months) from the date of receipt of supply whichever is earlier.

Buffer plunger assembly. drawing no.:- rdso/sk-98145 alt. (12) items- 3, 5, 6, 7, 14 & 17 specification:- icf/md/spec-252 (rev.00) amndt. 4 (issue status 01). special terms & conditions:- buffer plunger assembly items must be supplied in assembled form. guarantee:- guarantee replacement free of cost of such casting, which may develop defects within two years(24 months) from the date of fitment or within three years (36 months) from the date of receipt of supply whichever is earlier.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise