Tender Details
Particulars | Details |
---|---|
Title |
Engagement Of User Fee Agency Through E Tender At Buchireddypalem Fee Plaza At Km 722.450 For The Section From Mydukur To Nellore Section From Existing Km 589.000 To Km 741.950 Of Nh 67 In Andhra Pradesh
|
Description |
Engagement Of User Fee Agency Through E Tender At Buchireddypalem Fee Plaza At Km 722.450 For The Section From Mydukur To Nellore Section From Existing Km 589.000 To Km 741.950 Of Nh 67 In Andhra Pradesh
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_206220_1 |
Reference Number |
NHAI/13013/547/CO/24-25 /CB/Buchireddypalem FP |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=251448 |
Start Date | January 25, 2025 00:25 |
End Date |
06/02/2025 ( Expired 104 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreStrengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreIndependent engineering services for construction of churhat bypass including tunnel on rewa sidhi section of nh 75 e from chainage 33.200 to chainage 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Independent engineering services for construction of churhat bypass including tunnel on rewa sidhi section of nh 75 e from chainage 33.200 to chainage 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreof your Industry type