Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Supporting Roller Assembly For Drycon Conveyor In Bottom Ash Handling System 150 Nos
|
| Description |
Procurement Of Supporting Roller Assembly For Drycon Conveyor In Bottom Ash Handling System 150 Nos
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_425604_1 |
|
Reference Number |
CE MTPSII 600MW SI AE1 OT NO 161S 23 24 |
| Tender Fee | 0 |
| EMD | 15300 |
| Tender Value | |
| Place | MTPS-II, Mettur dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=505872 |
| Start Date | February 15, 2024 23:00 |
| End Date |
Expired
13/03/2024
Expired 814 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ktps vi stage chemical proximate analysis of coal samples on monthly basis and ultimate analysis of coal and analysis of ash like fly ash bottom ash samples on quarterly basis in ktps v and vi stages for the year 2026 2027
Ktps vi stage chemical proximate analysis of coal samples on monthly basis and ultimate analysis of coal and analysis of ash like fly ash bottom ash samples on quarterly basis in ktps v and vi stages for the year 2026 2027
Read moreProcurement of spares for inspection of sluice gate enclosure and bottom ash hopper and nozzle casing with nozzle tip of ceramic lining for 8 inch jet pump assembly of ahp, unit 10 and 11 stps, sarni.
Procurement of spares for inspection of sluice gate enclosure and bottom ash hopper and nozzle casing with nozzle tip of ceramic lining for 8 inch jet pump assembly of ahp, unit 10 and 11 stps, sarni.
Read morePurchase of 150 ah tublar batteries ( buy back)
Purchase of 150 ah tublar batteries (buy back) - 4 nos for college hostel
Read moreProcurement of gear boxes for conveyor system of chp stage-i and ii
Procurement of gear boxes for conveyor system of chp stage-i and ii quantity as per nit
Read moreAnnual watch and ward and patrolling services at hcsd and bottom ash pond of ph-iv (2x250mw) extension unit no. 10 and 11 at 130 hect ash pond for the year 2026-27 at stps sarni.
Annual watch&#x0d and ward and&#x0d patrolling&#x0d services at&#x0d hcsd and&#x0d bottom ash&#x0d pond of ph-iv&#x0d (2x250mw)&#x0d extension unit&#x0d no. 10 and 11 at&#x0d 130 hect ash&#x0d pond for the&#x0d year 2026-27&#x0d at stps sarni.
Read moreStrengthening of ramp and drainage system for 4 nos weigh bridge(no 3,4,5,6) at jayant project
Strengthening of ramp and drainage system for 4 nos weigh bridge(no 3,4,5,6) at jayant project
Read moreDrilling of 15 nos. 150 125 115mm dia 120 mtr. deep vertical telescopic tubewells in different habitations schools aanganwas of block khilchipur district rajgarh including installation of handpumps and construction of cement concrete platform
Drilling of 15 nos. 150 125 115mm dia 120 mtr. deep vertical telescopic tubewells in different habitations schools aanganwas of &#x0d block khilchipur district rajgarh including installation of handpumps and
Read moreDrilling of 15 nos. 150 125 115mm dia 120 mtr. deep vertical telescopic tubewells in different habitations schools aanganwas of block zeerapur district rajgarh including installation of handpumps and construction of cement concrete platforms
Drilling of 15 nos. 150 125 115mm dia 120 mtr. deep vertical telescopic tubewells in different habitations schools aanganwas of &#x0d block zeerapur district rajgarh including installation of handpumps and
Read moreBreaking of saftey ring in bottom depth of borewell for increasing the qty. of lowering pipe and development of borewell at various installation of borewells in sec 3 panchkula.
Breaking of saftey ring in bottom depth of borewell for increasing the qty. of&#x0d lowering pipe and development of borewell at various installation of borewells in sec 3 panchkula.
Read moreSelection of agency for implementation, operation and maintenance of 500 nos. electric public bicycle sharing (e-pbs) system on ppp mode for a period of 7 years
Selection of agency for implementation, operation and maintenance of 500 nos. electric public bicycle sharing (e-pbs) system &#x0d on ppp mode for a period of 7 years
Read moreof your Industry type