Tender Details
Particulars | Details |
---|---|
Title |
Development Conc. Rd. And Drain At 27 Umesh Mukherjee Road,At Ward No. 21 Under Kamarhati Municipality.
|
Description |
Development Conc. Rd. And Drain At 27 Umesh Mukherjee Road,At Ward No. 21 Under Kamarhati Municipality.
|
Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
Tender Id | 2024_MAD_708111_1 |
Reference Number |
WBMAD/KM/PW/14th Fin _5th SFC/NIT-40(e)/23-24(2ND CALL) |
Tender Fee | 0 |
EMD | 11241 |
Tender Value | |
Place | 1, M.M. Feeder Road, P.O. Belgharia, 24-Parganas |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1704088 |
Start Date | November 14, 2024 23:30 |
End Date |
21/11/2024 ( Expired 172 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreDevelopment of muktidham at mathikatola in ward no. 01 under nagar parishad nowrozabad.
Development of muktidham at mathikatola in ward no. 01 under nagar parishad nowrozabad.
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreBeautification and boundrywall and light and gate construction work at ward no 15 in front of piyush choudhry house municipal council narmadapuram mp.
Beautification and boundrywall and light and gate construction work at ward no 15 in front of piyush choudhry house municipal council narmadapuram mp.
Read moreEstimate for electrification and lighting work. at meat market ward no. 2 anuppur.
Estimate for electrification and lighting work. at meat market ward no. 2 anuppur.
Read moreof your Industry type