Tender Details
Particulars | Details |
---|---|
Title |
Survey Work Required For Chimney Height Clearance Of Anpara E
|
Description |
Survey Work Required For Chimney Height Clearance Of Anpara E
|
Organisation | Meja Urja Nigam Pvt Ltd | Public Sector Undertakings |
Tender Id | 2024_MUNPL_203223_1 |
Reference Number |
400000320 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | MUNPL, Meja |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=222285 |
Start Date | August 09, 2024 23:00 |
End Date |
14/08/2024 ( Expired 298 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreLeft over work for work services for improvement of base security as af stn bagdogra
Left over work for work services for improvement of base security as af stn bagdogra
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreOverhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara
Overhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara
Read moreTerm contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Term contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreDeployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Deployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Read moreof your Industry type