Tender Details
Particulars | Details |
---|---|
Title |
Electrical Load Balancing At Speed Post Bhawan, Shahibaug, Ahmedabad.
|
Description |
Electrical Load Balancing At Speed Post Bhawan, Shahibaug, Ahmedabad.
|
Organisation | Department of Posts | Central Govt. Ministry/Department |
Tender Id | 2024_DOP_811395_1 |
Reference Number |
37/AEE/PESD/AHD/NIT/2024-25 |
Tender Fee | 0 |
EMD | 576 |
Tender Value | |
Place | Ahmedabad |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=852702 |
Start Date | June 12, 2024 19:30 |
End Date |
20/06/2024 ( Expired 327 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Read moreAppointment of consulting firm for the role of independent engineer for commercial utilization, operation and maintenance of multi-modal transport hub at sabarmati, ahmedabad
Appointment of consulting firm for the role of independent engineer for commercial utilization, operation and maintenance of multi-modal transport hub at sabarmati, ahmedabad
Read moreLighting maintenance wiring and other miscellaneous electrical works at kiom
Lighting maintenance wiring and other miscellaneous electrical works at kiom
Read moreEmpanelment of contractors for civil and electrical works at iit dharwad
Empanelment of contractors for civil and electrical works at iit dharwad
Read moreSpecial repair to drainage system and fencing of security wall at fafa tel bhawan under age b/r-ii of ge dehradun
Special repair to drainage system and fencing of security wall at fafa tel bhawan under age b/r-ii of ge dehradun
Read moreConstruction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreSupply and installation of microprocessor based three load cell duplex electronic net weighing and bagging machine on door delivery basis at hbl lauriya, west champaran, bihar
Supply and installation of microprocessor based three load cell duplex electronic net weighing and bagging machine on door delivery basis at hbl lauriya, west champaran, bihar
Read moreCarrying out ridership study (traffic study) for mumbai -ahmedabad high speed rail corridor (about 508 kms long)
Carrying out ridership study (traffic study) for mumbai -ahmedabad high speed rail corridor (about 508 kms long)
Read moreof your Industry type