Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Es Instn I Estimate For Releasing Refixing Of Critical Instruments Of Boiler Turbine And Mill Area And Also Cleaning Of Secondary Air Aero Foils Cva Panels Cable Tray And Cleaning And Terminal Tightness Checking Of Gvdc Transformers
|
| Description |
Ttps Es Instn I Estimate For Releasing Refixing Of Critical Instruments Of Boiler Turbine And Mill Area And Also Cleaning Of Secondary Air Aero Foils Cva Panels Cable Tray And Cleaning And Terminal Tightness Checking Of Gvdc Transformers
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_452848_1 |
|
Reference Number |
CE/SE/ES /TTPS /No.133 /2024-25 |
| Tender Fee | 0 |
| EMD | 1100 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=539029 |
| Start Date | June 07, 2024 23:00 |
| End Date |
Expired
12/06/2024
Expired 814 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps es instn i releasing refixing of critical instruments of boiler turbine and mill area and also cleaning of secondary air aero foils cva panels cable tray and cleaning and terminal tightness checking of gvdc transformers gvdc modules ups i
Ttps es instn i releasing refixing of critical instruments of boiler turbine and mill area and also cleaning of secondary air aero foils cva panels cable tray and cleaning and terminal tightness checking of gvdc transformers gvdc modules ups i
Read moreTtps es instn i estimate for releasing transporting overhauling painting re fixing and conducting functional test on 4 nos burner tilt power cylinders and releasing overhauling calibrating refixing and conducting load test on 44 nos sadc power cy
Ttps es instn i estimate for releasing transporting overhauling painting re fixing and conducting functional test on 4 nos burner tilt power cylinders and releasing overhauling calibrating refixing and conducting load test on 44 nos sadc power cy
Read moreTtps es instn i releasing transporting overhauling painting re fixing and conducting functional test on 4 nos burner tilt power cylinders and releasing overhauling calibrating refixing and conducting load test on 44 nos sadc power cylinders in un
Ttps es instn i releasing transporting overhauling painting re fixing and conducting functional test on 4 nos burner tilt power cylinders and releasing overhauling calibrating refixing and conducting load test on 44 nos sadc power cylinders in un
Read moreTtps es instn i releasing transporting overhauling painting re fixing and conducting functional test on 4 nos burner tilt power cylinders and releasing overhauling calibrating refixing and conducting load test on 44 nos sadc power cylinders in un
Ttps es instn i releasing transporting overhauling painting re fixing and conducting functional test on 4 nos burner tilt power cylinders and releasing overhauling calibrating refixing and conducting load test on 44 nos sadc power cylinders in un
Read moreTtps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during annual overhaul of unit v for the year 2025 2026
Ttps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during annual overhaul of unit v for the year 2025 2026
Read moreTtps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during annual overhaul of unit iv for the year 2025 2026
Ttps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during annual overhaul of unit iv for the year 2025 2026
Read moreTtps es circle instn ii removing cleaning flushing and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas disconnection and reconnection of power and control cables of actuators limit switches feedback cali
Ttps es circle instn ii unit v removing cleaning flushing and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas disconnection and reconnection of power and control cables of actuators limit switches feedba
Read moreTtps es circle instn ii removing cleaning flushing and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators, limit switches feedback ca
Ttps es circle instn ii removing cleaning flushing and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators, limit switches feedback ca
Read moreEngaging of workers/labours for desilting and cleaning storm water drain including removing and refixing of slab and also loading, unloading desilt earth/mud in the open truck in ward no. 22 to 25 (dabolim constituency) within municipal jurisdiction
Engaging of workers/labours for desilting and cleaning storm water drain including removing and refixing of slab and also loading, unloading desilt earth/mud in the open truck in ward no. 22 to 25 (dabolim constituency) within municipal jurisdiction
Read moreEngaging of workers/labours for desilting and cleaning storm water drain including removing and refixing of slab and also loading, unloading desilt earth/mud in the open truck in ward no. 1 to 9 (mormugao constituency) within municipal jurisdiction o
Engaging of workers/labours for desilting and cleaning storm water drain including removing and refixing of slab and also loading, unloading desilt earth/mud in the open truck in ward no. 1 to 9 (mormugao constituency) within municipal jurisdiction o
Read moreof your Industry type